Jan, 5, 2009

Final Sampling and Analysis Plan Addendum No. 1 for the Deep Bedrock Well Installation in the Basal Sharon Conglomerate. 12/19/2008

Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008

Final Removal Action Report for the RVAAP- 49 Central Burn Pits, Dec. 05, 2008

Draft of the Multi-Increment Sampling and Analysis of Soils Below Floor Slabs at RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, Dec. 4, 2008

Draft of the Sampling and Screening Analysis of Soils Below Floor Slabs at RVAAP- 09 Load Lines 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4, Version 2.0, at Ravenna Army Ammunition Plant, Dec. 01. 2008

Draft Work Plan Addendum 1 for the Sampling of Soils Below Floor Slabs and Remediation at RVAAP- 08 Load Line 1 and Other Building Locations at Ravenna Army Ammunition Plant, Nov. 18, 2008

Final Contractor Quality Control Plan for the Remedial Action at RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Nov. 17, 2008

Final Facility-Wide Groundwater Monitoring Program Report on the April 2008 Sampling Event, Nov. 10, 2008

Draft Accident Prevention Plan for the Removal of Buildings and Concrete Floor Slabs at RVAAP- 08 Load Line 1 and Other Miscellaneous Buildings and Removal and Disposal of Pallets at Ravenna Army Ammunition Plant, Nov. 1, 2008

Draft of the Facility-Wide Groundwater Monitoring Program Report on the July 2008 Sampling Event, Volume 1-6, Oct. 31, 2008

Final Facility-Wide Groundwater Monitoring Program Background Calculation Update, Oct 28, 2008

Final Quality Assurance Project Plan Part II Addendum of the MEC Clearance and Munitions Response for RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Oct. 27. 2008

Final Field Sampling and Analysis Plan MEC Clearance and Munitions Response Amendment 1 for RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Oct. 24, 2008

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, OctoberTrip Report, Oct. 23, 2008

Final Explosives Safety Submission for the Munitions and Explosives of Concern Survey and Munitions Response of RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Revision 3, Amendment 3, Oct. 9, 2008

Final Site Safety and Health Plan Amendment for the Phase II MEC Clearance and Munition Response at RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Sept. 04, 2008

Final Project Management Plan for RVAAP- 05 Winklepeck Burning Grounds Remedial Design/Remedial Action, Revision 2, Sept. 4, 2008

Final Explosives Safety Submission for the Munitions and Explosives of Concern Survey and Munitions Response of RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Revision 3, Amendment 2, Apr. 18, 2008

Final Explosives Safety Submission for the Munitions and Explosives of Concern Survey and Munitions Response of RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Revision 3, Amendment 1, Aug, 31, 2004

Final Phase I Remedial Investigation Report for RVAAP-03 Demolition Area #1 at Ravenna Army Ammunition Plant, Dec, 2001

Dec. 5, 2008 Proposed Plan for the Soil and Dry Sediment at the RVAAP-49 Central Burn Pits

Oct. 29, 2008

Final Record of Decision for Soil and Dry Sediment at RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Aug. 6, 2008

Documents Summarizing Ammunition Production at Ravenna Arsenal between 1941 - 1974, Jan. 1, 1974

Oct. 24, 2008

Draft Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Oct 10, 2008

Draft Site-Specific Work Plan for the RVAAP- 08 Load Line 1 Igniter Tube Disposal at Ravenna Army Ammunition Plant, Oct 2, 2008

Final Construction Completion Report Time Critical Response Action for the Rocket Area of RVAAP- 04 Open Demolition Area #2 Military Munitions Response Program, Sept. 23, 2008

Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008

Final Facility-Wide Groundwater Monitoring Program Background Calculation Update, Sept, 12, 2008

Draft-Proposed Plan for Soil And Dry Sediment at the RVAAP-49 Central Burn Pits. September 8, 2008

Final Project Management Plan for RVAAP-05 Winklepeck Burning Grounds Remedial Design/Remedial Action, Revision 2, Sept 4 2008

Draft Site Safety and Health Plan Amendment for the Phase II MEC Clearance and Munition Response at RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Sept 4, 2008

Draft Sampling and Analysis Plan Addendum No.1 for the Deep Bedrock Well Installation in the Basal Sharon Conglomerate-8/28/08

Final of the Facility-Wide Groundwater Monitoring Program Report of the January 2008 Sampling Event, Main Text and Appendices A-C, Volume 1-3, Aug. 22, 2008

Sept. 16, 2008

Draft-Proposed Plan for Soil And Dry Sediment at the RVAAP-49 Central Burn Pits. September 8, 2008

Draft Sampling and Analysis Plan Addendum No.1 for the Deep Bedrock Well Installation in the Basal Sharon Conglomerate-8/28/08

Draft Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant

August 7, 2008

Ravenna Army Ammunition Plant Deliverable Document Format Guidelines, Version 7.0, Aug. 2008

Draft Construction Completion Report Time Critical Response Action for the Rocket Area of RVAAP- 04 Open Demolition Area #2 Military Munitions Response Program, Aug. 2008

Draft Facility-Wide Groundwater Monitoring Program Report on the April 2008 Sampling Event, Volume 1 Main Text and Appendices A - D, July 2008

Draft Record of Decision for Soil and Dry Sediment at RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, July 2008


August 4, 2008

Draft Remedial Action Work Plan for RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, July 2008

Draft Facility-Wide Groundwater Monitoring Program Background Calculation Update, June 2008

Final Remedial Investigation Report Addendum No. 1 for the RVAAP- 49 Central Burn Pits at Ravenna Army Ammunition Plant, June 2008

June 24, 2008

Draft Revised Operations and Maintenance Plan Sand Creek Barrier System, Time Critical Response Action Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, Site-Specific Health and Safety Plan, May 30, 2008

Draft Revised Operations and Maintenance Plan Sand Creek Barrier System, Time Critical Response Action Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, Explosive Site Plan, May 30, 2008

Draft Revised Operations and Maintenance Plan for the Sand Creek Barrier System, the Time Critical Response Action at the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, Military Munitions Response Program, May 30, 2008

Final of the Work Plan for the Sampling of Soils Below Floor Slabs at Load Lines 2-4 and Excavation and Transportation of Contaminated Soils to Load Line 4 (Buildings G-1, G-1A, and G-3), May 29, 2008

Final Report on the Geophysical Investigation of RVAAP-28 the Suspected Mustard Agent Burial Site. May 21, 2008

June 12, 2008 Final Report on the Geophysical Investigation of RVAAP-28 the Suspected Mustard Agent Burial Site. May 21, 2008
June 5, 2008

RVAAP Site Tour Agenda - 1968

May 15, 2008

Final Site Inspection for the Military Munitions Response Program, May 2008

RVAAP’s Facility Wide Human Health Risk Assessor Manual Amendment 1. 01 Dec 2005

May 13, 2008

Draft of the Facility-Wide Groundwater Monitoring Program Report of the January 2008 Sampling Event, Main Text and Appendices A-C, Volume 1-3, May 2008

Final Report for the Phase I Remedial Investigation at RVAAP-42 Load Line 9, Volume 1-4, Oct 2007

Final Report for the Phase I Remedial Investigation of RVAAP-33 Load Line 6, Volume 1- 4, Aug 2007

May 12, 2008

Draft of the Preliminary Evaluation of Pre (Floor Slab Removal) Contamination Beneath Selected Buildings at Load Lines 2, 3, and 4, Apr 2008

Final Facility-Wide Groundwater Monitoring Program Report on the October 2007 Sampling Event, Volume 1 – Main Text and Appendices A-C, Apr 2008

May 9, 2008

Draft Report on the Geophysical Investigation of the suspected RVAAP-28 Mustard Agent Burial Site, Feb 2008

Draft Facility-Wide Human Health Cleanup Goal White Paper, Feb 2008

Draft Report on the Geophysical Investigation of the suspected RVAAP-28 Mustard Agent Burial Site, Feb 2008

Draft of the Work Plan for the Sampling of Soils Below Floor Slabs at Load Lines 2-4 and Excavation and Transportation of Contaminated Soils to Load Line 4 (Buildings G-1, G-1A, and G-3), Apr 2008

Draft Remedial Investigation Report Addendum No. 1 for the RVAAP- 49 Central Burn Pits, Apr 2008

Final Removal Action Work Plan for RVAAP-49 Central Burn Pits, Aug 2007

Final Safety, Health and Emergency Response Plan Addendum for the Remediation of Soils at Load Lines 1, 2, 3, and 4, June 2007

Final Sampling and Analysis Plan Addendum No. 2 for the Phase I Remedial Investigation of Ramsdell Quarry Landfill, June 2006

Final Report on the Additional Groundwater Monitoring Well Installation and Groundwater Sampling at the Suspected RVAAP-28 Mustard Agent Burial Site, May 2006

Final Facility Wide Groundwater Monitoring Program Report on the May 2006 Sampling Event, Oct 2006

Final Facility Wide Groundwater Monitoring Program Report on the April 2005 Sampling Event, Aug 2005

Final Phase I Remedial Investigation December 2004 Follow-On Groundwater Sampling at RVAAP-01 Ramsdell Quarry Landfill, June 2005

Final Site Safety and Health Plan for the Phase II MEC Clearance and Munitions Response at RVAAP-05 Winklepeck Burning Grounds, Mar. 2005

Final Work Plan for Phase II MEC Clearance and Munitions Response at RVAAP-05 Winklepeck Burning Grounds, Mar. 2005

Revised Final Focused Feasibility Study for RVAAP-05 Winklepeck Burning Grounds, Mar, 2005

Final Phase I MEC Density Survey After Action Report at RVAAP-05 Winklepeck Burning Grounds, Mar, 2005

Final Facility Wide Groundwater Monitoring Program Annual Report for 2005

Final Facility Wide Groundwater Monitoring Program Report on the July 2005 Sampling Event-Main Report and Appendices A-C, Nov 2005

Final Work Plan and Sampling and Analysis Addenda for the Groundwater Monitoring Well Installation and Groundwater Sampling at the Suspected RVAAP-28 Mustard Agent Burial Site, Nov 2004

Final Proposed Remedial Goal Options for Soil at RVAAP- 08, 09, 10, and 11 Load Lines 1- 4, Sept. 2004

Final Report for the Assessment of Potential Contamination at the DLA Outdoor Storage Areas, Aug, 2003

Final Site Safety and Health Plan Addendum No. 1 for the Phase II Remedial Investigation of RVAAP-12 Load Line 12, Sept, 2000

Draft Sampling and Analysis Plan and Site Safety and Health Plan Addendum No. 2 for the Biological Measurements at RVAAP-05 Winklepeck Burning Grounds, May 2000

Final Site Safety and Health Plan Addendum No. 1 for the Phase I Remedial Investigation of Demolition Area #1, Oct 1999

May 1, 2008 Final Remedial Action Work Plan Remediation of Soils at Load Lines 1- 4  (RVAAP- 08, 09, 10, and 11) 4/5/2007

Apr. 4, 2008 Final Characterization of 14 AOCs at Ravenna Army Ammunition Plant, March 2007.

Mar. 06, 2008

Final Construction Completion Report, Munitions Response for the Demolition of RVAAP-41 Load Line 8 and RVAAP-43 Load Line 10, Addendum 1 Demolition of Building 1034, Mar. 2008

Draft Project Coordination Plan for the Sampling of Soils Below Floor Slabs at RVAAP- 09, 10, and 11 Load Lines 2, 3, and 4 and excavation and Transportation of Contaminated Soils to RVAAP- 11 Load Line 4 (Buildings G-1, G-1A and G-3),
Mar. 2008

Final Letter Report Work Plan for the Sampling of Soils Below Floor Slabs at RVAAP- 09, 10, and 11 Load Lines 2, 3, and 4 and Excavation and Transportation of Contaminated Soils to RVAAP- 11 Load Line 4 (Buildings G-1, G-1A and G-3) Feb.2008

Draft Letter Report Work Plan for Pre-Slab Removal Tasks, Jan. 25, 2008

Feb. 12, 2008

Final Record of Decision for Soil and Dry Sediment at the RVAAP-02 Erie Burning Grounds, Sept 19, 2007

Final Record of Decision for Soil and Dry Sediment at the RVAAP-04 Open Demolition Area #2, Sept 19, 2007

Final Record of Decision for Soil and Dry Sediment at the RVAAP-16 Fuze and Booster Quarry Landfill/Ponds, Sept 19, 2007

Jan. 25, 2008 Final Revised Interim Record of Decision for the Remediation of Soils at RVAAP-08, 09, 10, 11 Load Lines 1 – 4, Jan.18, 2007

Jan. 16, 2008 Installation Action Plan for Ravenna Army Ammunition Plant. FY 2007, January, 2008

Sept. 27 , 2007 Hazardous and Medical Waste Study No. 37-EF-5360-99 Relative Risk Site Evaluation for Newly Added Sites. October 1998

Aug. 31, 2007

Closure, Completion of Closure for RVAAP-14 Load Line 6 Evaporation Unit. January 1993

Closure, Completion of Partial Closure of RVAAP-07 Building 1601 Hazardous Waste Storage and RVAAP-05 Winklepeck Burning Grounds (OBG). May 1999

Closure, Final Closure Inspection of RVAAP-01 Ramsdell Quarry Landfill. Sept. 1990

Closure, Final Closure Report Approval for Buildings W-221 and X-232. July 2000

Closure, Final Closure Report for RVAAP-37 Pesticide Storage Building T-4452. Sept. 2000

Closure, No Further Action for RVAAP-27 Building 854-PCB Storage. Sept. 1999

Closure, No Further Action, Statement of Basis for the Final Decision for RVAAP-47 Building T-5301 Interim Removal Action. Dec. 2000

July 25, 2007

Draft Facility-Wide Groundwater Monitoring Program Report on the April 2007 Sampling Event. July 16, 2007.

 

July 18, 2007

Final Stormwater Pollution Prevention Plan Remediation of Soils at RVAAP-08, 09, 10, and 11, Load Lines 1-4. July 12, 2007. Shaw.

 

July 09, 2007

Final Facility-wide Groundwater Monitoring Program Report on the January 2007 Sampling Event (Sample Event No. 1). July 9, 2007. SpecPro Inc.

 

June 26, 2007

Draft Removal Action Work Plan for Central Burn Pits (RVAAP-49), Ravenna Army Ammunition Plant, Ravenna, Ohio. June

Final Action Memorandum for Central Burn Pits (RVAAP-49, Ravenna Army Ammunition Plant, Ravenna, Ohio. June 2007


June 20, 2007

Draft Report for the Remedial Investigation at Load Line 6 (RVAAP–33) at the Ravenna Army Ammunition Plant. June 2007

Draft Report for the Remedial Investigation at Load Line 9 (RVAAP–42) at the Ravenna Army Ammunition Plant. May 2007


Apr. 02, 2007

Final Proposed Plan for Soil and Dry Sediment at Fuze and Booster Quarry Landfill/Ponds (RVAAP-16) Ravenna Army Ammunition Plant, Ravenna, Ohio. March 2007.

Final Proposed Plan for Soil and Dry Sediment at the Ramsdell Quarry Landfill (RVAAP-01) Ravenna Army Ammunition Plant, Ravenna, Ohio. March 2007

Final Proposed Plan for Soil and Dry Sediment at Load Line 12 (RVAAP-12) Ravenna Army Ammunition Plant, Ravenna, Ohio. March 2007

Final Facility-Wide Groundwater Monitoring Program Plan For The Ravenna Army Ammunition Plant Ravenna, Ohio. September 2004



Mar. 20, 2007 Public Presentation for Proposed Plans at Erie Burning Grounds and Open Demolition Area #2, March 13, 2007
Feb. 27, 2007 Final Proposed Plan for Soil and Dry Sediment at Open Demolition Area #2 (RVAAP- 04) Ravenna Army Ammunition Plant Ravenna, Ohio February 2007
Feb. 27, 2007 Final Proposed Plan for Soil and Dry Sediment at Erie Burning Grounds (RVAAP-02) Ravenna Army Ammunition Plant Ravenna, Ohio February 2007
Jan. 31, 2007 Final Engineering Evaluation/Cost Analysis for Central Burn Pits (RVAAP-49) Ravenna Army Ammunition Plant, Ravenna, Ohio, January 2007
Jan. 19, 2007 Final Focused Feasibility Study for the Remediation of Soils at LLs 1-4, RVAAP May 2005

Final Phase II Remedial Investigation at the Upper and Lower Cobbs Pond (AOC 29) September 2005

Final Report Interim Removal Action at Load Line 11 (AOC-44) March 2004

Final Remedial Investigation at Load Line 11 (AOC-44) September 2005

Final Report for Remedial Design/Removal Action at Paris-Windham Road Dump (AOC-51) at RVAAP March 2004

Final Sampling and Analysis Plan Addendum for the Characterization of 14 RVAAP AOCs at RVAAP Oct. 2004

 

Nov. 8, 2006

Ravanna Army Ammunition Plant Director's Final Findings and Orders

Final Facility-Wide Groundwater Monitoring Program Plan For The Ravenna Army Ammunition Plant Ravenna, Ohio. September 2004


Oct. 31, 2006

Revised Final Feasibility Study for Ramsdell Quarry Landfill (RVAAP-01), Ravenna Army Ammunition Plant, Ravenna, Ohio, October 2006


Sept. 29, 2006

Final Addendum to the Phase II Remedial Investigation Report for Erie Burning Grounds (RVAAP-02) Ravenna Army Ammunition Plant Ravenna, Ohio. September 2006


Sept. 15, 2006 Revised Final Report On The Biological Field-Truthing Effort At Winklepeck Burning Grounds At Ravenna Army Ammunition Plant, Ravenna, Ohio. August 2006
Sept. 13, 2006 Final Addendum to the Phase II Remedial Investigation Report for Open Demolition Area #2 (RVAAP-04) Ravenna Army Ammunition Plant Ravenna, Ohio. September 2006.
July 27, 2006

Draft Addendum to the Phase II Remedial Investigation Report for Erie Burning Grounds (RVAAP-02) Ravenna Army Ammunition Plant Ravenna, Ohio. July 2006.

Draft Addendum to the Phase II Remedial Investigation Report for Open Demolition Area #2 (RVAAP-04) Ravenna Army Ammunition Plant Ravenna, Ohio. July 2006


July 21, 2006

Final Feasibility Study for Fuze and Booster Quarry Landfill/Ponds (RVAAP-16) Ravenna Army Ammunition Plant Ravenna, Ohio July 2006


July 17, 2006

Final Feasibility Study for Ramsdell Quarry Landfill (RVAAP-01) Ravenna Army Ammunition Plant Ravenna, Ohio July 2006
(see revised document, Oct. 31, 2006)

Final Feasibility Study for Load Line 12 (RVAAP-12) Ravenna Army Ammunition Plant Ravenna, Ohio July 2006

 

April 7, 2006

Final Phase II Remedial Investigation Report for the Open Demolition Area #2 (RVAAP-04) at the Ravenna Army Ammunition Plant Ravenna, Ohio September 2005


April 4, 2006

Draft Feasibility Study for Ramsdell Quarry Landfill (RVAAP-01) Ravenna Army Ammunition Plant Ravenna, Ohio March 2006 (replaced by Final Version, July 17, 2006)

Draft Feasibility Study for Erie Burning Grounds (RVAAP-02) Ravenna Army Ammunition Plant Ravenna, Ohio March 2006

Draft Feasibility Study for Open Demolition Area #2 (RVAAP-04) Ravenna Army Ammunition Plant Ravenna, Ohio March 2006

Draft Feasibility Study for Load Line 12 (RVAAP-12) Ravenna Army Ammunition Plant Ravenna, Ohio March 2006
(replaced by Final Version, July 17, 2006)

Draft Feasibility Study for Fuze and Booster Quarry Landfill/Ponds (RVAAP-16) Ravenna Army Ammunition Plant Ravenna, Ohio March 2006 (replaced by Final Version, July 21, 2006)

Draft Feasibility Study for Central Burn Pits (RVAAP-49) Ravenna Army Ammunition Plant Ravenna, Ohio March 2006

Final Facility-Wide Biological and Water Quality Study 2003 Ravenna Army Ammunition Plant November 2005

Final Phase II Remedial Investigation Supplemental Report for Load Line 12 (Rvaap-12) at the Ravenna Army Ammunition Plant, Ravenna, Ohio November 2005

Final Phase I/Phase II Remedial Investigation of the Fuze and Booster Quarry Landfill/Ponds (RVAAP-16) Ravenna Army Ammunition Plant Ravenna, Ohio November 2005

Final Phase I Remedial Investigation Report for Ramsdell Quarry Landfill at the Ravenna Army Ammunition Plant, Ravenna, Ohio September 2005

Final Phase II Remedial Investigation Report for Erie Burning Grounds (Rvaap-02) at the Ravenna Army Ammunition Plant, Ravenna, Ohio September 2005

Final Remedial Investigation Report for the Central Burn Pits (Rvaap-49) at the Ravenna Army Ammunition Plant Ravenna, Ohio September 20, 2005

   
   
   
   

 