Final Remedial Investigation/Feasibility Study Report for Soil, Sediment, and Surface Water at RVAAP-06 C Block Quarry

February 26, 2019

 

Description and Link

File Name

Size (Mbyte)

Main Text

F_RI_FS_SSSW_CBQ_40_06.pdf

24.6

Appendix A Field Sampling Logs

F_RI_FS_SSSW_CBQ_40_06_APP_A.pdf

1.8

Appendix B Project QA Summary

F_RI_FS_SSSW_CBQ_40_06_APP_B.pdf

1.0

Appendix C Data QC Summary

F_RI_FS_SSSW_CBQ_40_06_APP_C.pdf

5.98

Appendix D Lab Results and COCs

F_RI_FS_SSSW_CBQ_40_06_APP_D.pdf

135

Appendix E F&T 021919

F_RI_FS_SSSW_CBQ_40_06_APP_E.pdf

3.5

Appendix F IDW Mgmt Reports

F_RI_FS_SSSW_CBQ_40_06_APP_F.pdf

.22

Appendix G HHRA Tables

F_RI_FS_SSSW_CBQ_40_06_APP_G.pdf

1.06

Appendix H ERA Info. and Data

F_RI_FS_SSSW_CBQ_40_06_APP_H.pdf

1.54

Appendix I PBA08 RI Summary

F_RI_FS_SSSW_CBQ_40_06_APP_I.pdf

1.92

Appendix J Asbestos Results Report

F_RI_FS_SSSW_CBQ_40_06_APP_J.pdf

1.59

Appendix K Detailed Cost Estimate

F_RI_FS_SSSW_CBQ_40_06_APP_K.pdf

.152

Appendix L Ohio EPA comments

F_RI_FS_SSSW_CBQ_40_06_APP_L.pdf

6.35