Description and Link

File Name

Size (Mbyte)

Main Text

RVAAP_Final_RACR_Exsitu_LL_1_4_12 text_tables_figures

6.84

Appendixes ABCDE_GH_J_L_N_PQRS

RVAAP_RACR_Exsitu_LL_1_4_12_AppendixesABCDE_GH_J_L_N_PQRS

93.7

Appendix F

AppF_AnalyticalDataReports_ExcavConf

124

Appendix I

AppI_AnalyticalDataReports_TreatmentVerif

139

Appendix K

AppK_RVAAP LL1-4&12_MetalsSoilAnalytical_158523_158589

29.0

Appendix M

AppM_RVAAP LL1-4&12_ConcreteAnalytical_157958_level4

8.18

Appendix O

AppO_RVAAP LL1-4&12_BackfillAnalytical157970_level4

46.7

Final Remedial Action Completion Report for Load Lines 1, 2, 3, 4, and 12 (RVAAP-08 and 12)

Former Ravenna Army Ammunition Plant Portage and Trumbull Counties, Ohio

October 29, 2021