Title: Final Site Inspection Addendum for CC RVAAP-78 Quarry Pond Surface Dump

Description

File Name and Link

Size (Mbyte)

Main Text

Appendices A, B, D, E, and F

F_SI_A_CC78.pdf

18.40

Appendix C – Analytical Results, Lab Data, and COCs

 

 

COCs

COCs_CC78_compiled_2-11-15_FR_Redacted.pdf

3.78

Analytical Results

All data with final qualifiers  CC78 rev21Jan2015.pdf

0.36

Lab Data Packages

22559-1 (1 of 3).pdf

36.94

 

22559-1 (2 of 3).pdf

59.19

 

22559-1 (3 of 3).pdf

20.34

 

22559-2.pdf

15.38

 

22562-1 (1 of 2).pdf

40.02

 

22562-1 (2 of 2).pdf

40.25

 

ACM lab result for 078SB-0033M-0001-SB.pdf

0.01

 

078 Test pit ACM grab samples -ACM.pdf

0.14

 

Attachment_A.pdf

0.18

 

Attachment_B.pdf

0.25

 

Worksheet 1.pdf

0.68

 

Worksheet 2.pdf

0.17

 

Worksheet 3.pdf

0.53

 

Worksheet 4.pdf

0.06

 

Worksheet 5.pdf

0.16

 

Worksheet 6.pdf

0.23

 

Worksheet 7.pdf

0.15

Appendix G

Appendix G.pdf

27.96