Title: Final Remedial Investigation/Feasibility Study Report for Soil, Sediment, and Surface Water at RVAAP-40 Load Line 7

Description

File Name and Link

Size (Mbyte)

Main Text

Final_LL7_RI-FS_072816.pdf

59.44

Appendix A

Final_LL7_RI-FS_App. A_Field Sampling Logs.pdf

12.97

Appendix B

Final_LL7_RI-FS_App. B_QA Summary.pdf

0.63

Appendix C

Final_LL7_RI-FS_App. C_Data QC Summary Report.pdf

4.48

Appendix D

Final_LL7_RI-FS_App. D_Lab Results and COCS.pdf

390.76

Appendix E

Final_LL7_RI-FS_App. E_FT Modeling Results.pdf

1.51

Appendix F

Final_LL7_RI-FS_App. F_IDW Mgmt Reports.pdf

0.21

Appendix G

Final_LL7_RI-FS_App. G_HHRA Tables.pdf

1.65

Appendix H

Final_LL7_RI-FS_App. H_ERA Info. and Data.pdf

0.57

Appendix I

Final_LL7_RI-FS_App. I_PBA08 RI Summary.pdf

2.01

Appendix J

Final_LL7_RI-FS_App. J_Cost Estimate.pdf

0.07

Appendix K

Final_LL7_RI-FS_App. K_Ohio EPA Comments.pdf

0.48