Click on area for document list.
RVAAP
Facility-wide Documents
RVAAP-66 Facility-wide Groundwater
RVAAP-67 Facility-wide Sewers
Buildings W-221 and X-232
DLA Storage
RVAAP-01 Ramsdell Quarry Landfill
RVAAP-02 Erie Burning Grounds
RVAAP-03 Open Demolition Area #1
RVAAP-04 Open Demolition Area #2
RVAAP-05 Winklepeck Burning Grounds
RVAAP-06 C Block Quarry
RVAAP-07 Building 1601 Hazardous Waste Storage
RVAAP-08 Load Line 1
RVAAP-09 Load Line 2
RVAAP-10 Load Line 3
RVAAP-11 Load Line 4
RVAAP-12 Load Line 12
RVAAP-13 Building 1200
RVAAP-14 Load Line 6 Evaporation Unit
RVAAP-16 Fuze and Booster Quarry Landfill/Pond
RVAAP-17 Deactivation Furnace
RVAAP-18 Load Line 12 Pink Waste Water Treatment
RVAAP-19 Landfill North of Winklepeck Burning Grounds
RVAAP-27
Building 854-PCB Storage
RVAAP-28 Mustard Agent Burial Site
RVAAP-29 Upper and Lower Cobbs Ponds
RVAAP-33 Load Line 6
RVAAP-34 Sand Creek Disposal Road Landfill
RVAAP-35 Bldg. 1037 Laundry
RVAAP-36 Pistol Range
RVAAP-37 Pesticide Storage Building T-4452
RVAAP-38 NACA Test Area
RVAAP-39 Load Line 5
RVAAP-40 Load Line 7
RVAAP-41 Load Line 8
RVAAP-42 Load Line 9
RVAAP-43 Load Line 10
RVAAP-44 Load Line 11
RVAAP-45 Wet Storage Area
RVAAP-46 Buildings F-15 and F-16
RVAAP-47
Building T-5301
RVAAP-48 Anchor Test Area
RVAAP-49 Central Burn Pits
RVAAP-50 Atlas Scrap Yard
RVAAP-51 Dump Along Paris-Windham Road
CC-RVAAP-68 thru CC-RVAAP-80
Munitions Response Sites
Return to Documents
RVAAP Facility-wide Documents (Back to top)
Historical Archives
Restoration Advisory Board Meeting Minutes
Papers on geochemical evaluation techniques
- Myers, J. and K. Thorbjornsen, 2004, “Identifying Metals Contamination in Soil: A Geochemical Approach,” Soil & Sediment Contamination: an International Journal, Vol. 13, No. 1, pp. 1-16.
- Thorbjornsen, K. and J. Myers, 2007, “Identification of Metals Contamination in Firing-Range Soil Using Geochemical Correlation Evaluation,” Soil & Sediment Contamination: an International Journal, Vol. 16, No. 4.
- Thorbjornsen, K. and Myers, J., 2007, “Identifying Metals Contamination in Groundwater Using Geochemical Correlation Evaluation,” Environmental Forensics, Vol. 8, Nos. 1-2, pp. 25-35.
- Thorbjornsen, K. and Myers, J., 2008, “Geochemical Evaluation of Metals in Groundwater at Long-Term Monitoring Sites and Active Remediation Sites,” Remediation, Vol. 18, Issue 2, pp. 99-114.
Final Quality Control Plan for the Revision of the Facility-Wide Environmental Documents, July 27, 2010
Draft Public Involvement Plan Addendum for Military Munitions Response Program Remedial Investigation Environmental Services, July 19, 2010
Draft Work Plan for the Military Munitions Response Program Remedial Investigations Environmental Services, July 6, 2010
Final Facility-Wide Human Health Cleanup Goals for Ravenna Army Ammunition Plant, Mar. 23, 2010
“Final Installation Action Plan Ravenna Army Ammunition Plant - FY 2009” September 18, 2009
Ravenna Army Ammunition Plant Deliverable Document Format Guidelines, Version 17.0. Sept. 18, 2009
Final Position Paper for the Application and Use of Facility-Wide Human Health Cleanup Goals, June 1, 2009
Draft Ravenna Army Ammunition Plan Installation Action Plan for FY 2009, Issue April 20. 2009
Final Facility-Wide Groundwater Monitoring Program Annual Report for 2008, Mar. 25, 2009
Draft Facility-Wide Human Health Cleanup Goals for Ravenna Army Ammunition Plan, Sept. 19, 2008
Installation Action for Ravenna Ammunition Plant, FY 2008, Aug. 20, 2008
Final Site Inspection for the Military Munitions Response Program, May 2008
Draft Green Paper Facility-Wide Risk-Based Ecological Cleanup Goal Development, Mar 2008
Draft Facility-Wide Human Health Cleanup Goal White Paper, Feb 2008
RVAAP’s Facility Wide Human Health Risk Assessor Manual Amendment 1. 01 Dec 2005
Final Facility-Wide Biological and Water Quality Study 2003 Ravenna Army Ammunition Plant November 2005.
Installation Action Plan for Ravenna Army Ammunition Plant. FY 2006 July 15, 2005.
RVAAP Tour Handouts, July 2005
Ravanna Army Ammunition Plant Director's Final Findings and Orders, 2004.
Final Archives Search Report for Ravenna Army Ammunition Plant, Jun. 1, 2004
Installation Action Plan for Ravenna Army Ammunition Plant.FY 2005 May, 2004.
Installation Action Plan for Ravenna Army Ammunition Plant. FY 2004 January, 2004.
Final Ravenna Army Ammunition Plant Facility Wide Ecological Risk Work Plan, April 21, 2003
Final Ravenna Army Ammunition Plant's Facility Wide Surface Water Assessment Workplan, Jan. 27, 2003
Final Facility-Wide Sampling and Analysis Plan for RVAAP. Mar-2001
Final Facility-Wide Safety and Health Plan for Environmental Investigations at RVAAP. Mar-2001
Final Environmental Information Management Plan for RVAAP. Mar-2001
Final Standard Operating Procedure for Field Colorimetric Analysis of Explosives for RVAAP. Mar-2001
Final Environmental Information Management Needs Assessment at RVAAP, Sept. 1999
Report on the Field Survey of Concrete Monuments at Ravenna Army Arsenal, Jan 6, 1999
Final Environmental Baseline Survey for the Ravenna Army Ammunition Plant, Sept. 25, 1998
Radiation Survey Report No. CESWT-SO-R2-05-98 Monazite AOC at Ravenna Army Ammunition Plant, 5/18/98
Final Action Plan for the Ravenna Army Ammunition Plant. Mar-1996
Final Preliminary Assessment for the Ravenna Army Ammunition Plant. Feb-1996
Documents Summarizing Ammunition Production at Ravenna Arsenal between 1941 - 1974, Jan. 1, 1974
RVAAP Site Tour Agenda - 1968
Building the Ravenna Ordnance Plant, a Job History Introduction, 1943
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 3, Number 2, February 1943
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 3, Number 1, January 1943
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 12, December 1942
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 5, May 1942
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 2, February 1942
Historical Archives - Ravenna Ordnance Plant Manual of Safe Practices, Jan 1941
RVAAP-66 Facility-Wide Groundwater
Final Facility-wide Groundwater Monitoring Program Report on the January 2010 Sampling Event, July 6, 2010
Final Facility-Wide Groundwater Monitoring Program Report on the 2009 Metals Sampling Event, Volume 1 - Main Text, Appendices A - C, June 2, 2010
Final Quality Control Plan for the Geochemical Evaluation of Metals in Groundwater, May 26, 2010
Final Monitoring Report for the Deep Bedrock Well Installation in the Basal Sharon Conglomerate, May 21, 2010
Final Facility-Wide Groundwater Monitoring Program Report on the October 2009 Sampling Event, Apr. 19, 2010
Final Facility-Wide Groundwater Monitoring Program Annual Report for 2009, Mar 4, 2009
Draft Facility-Wide Groundwater Monitoring Program Report on the October 2009 Sampling Event, Volume 1 - Main Text, Appendices A- D, Feb. 5, 2010
Final Facility-Wide Groundwater Monitoring Program Report on the July 2009 Sampling Event, Volume 1, Jan. 25, 2010
Draft Work Plan for the Geochemical Evaluation of Metals in Groundwater at Ravenna Army Ammunition Plant, Jan.14, 2010
Draft Faciilty-Wide Groundwater Monitoring Program Annual Report for 2009, Dec. 10, 2009
Final Facility-Wide Groundwater Monitoring Program Report on the April 2009 Sampling Event, Volume 1, Appendices A - D, Nov 09, 2009
Draft Facility-Wide Groundwater Monitoring Program Metals Analysis Addendum, Sept. 10, 2009
Final of the Facility-Wide Groundwater Monitoring Program Report on the January 2009 Sampling Event, July 31, 2009
Final Facility-Wide Groundwater Monitoring Program Report on the October 2008 Sampling Event at Ravenna Army Ammunition Plant, June 15, 2009
Final Facility-Wide Groundwater Monitoring Program Report on the July 2008 Sampling Event, Volume 1-6, Feb. 12, 2009
Draft Facility-Wide Groundwater Monitoring Program Report on the October 2008 Sampling Event at Ravenna Army Ammunition Plant, Jan 30, 2009
Final Sampling and Analysis Plan Addendum No. 1 for the Deep Bedrock Well Installation in the Basal Sharon Conglomerate. 12/19/2008
Draft Facility-Wide Groundwater Monitoring Program Annual Report for 2008, Dec. 12, 2008
Final Facility-Wide Groundwater Monitoring Program Report on the April 2008 Sampling Event, Nov. 10, 2008
Final Facility-Wide Groundwater Monitoring Program Background Calculation Update, Oct 28, 2008
Final Facility-Wide Groundwater Monitoring Program Background Calculation Update, Sept, 12, 2008
Final of the Facility-Wide Groundwater Monitoring Program Report of the January 2008 Sampling Event, Main Text and Appendices A-C, Volume 1-3, Aug. 22, 2008
Final Facility-Wide Groundwater Monitoring Program Report on the October 2007 Sampling Event, Volume 1 – Main Text and Appendices A-C, Apr 2008
Final Facility-Wide Groundwater Monitoring Program Report on the April 2007 Sampling Event. Nov. 27, 2007
Final Facility-wide Groundwater Monitoring Program Report on the January 2007 Sampling Event (Sample Event No. 1). July 9, 2007. SpecPro Inc.
Final Facility Wide Groundwater Monitoring Program Report on the May 2006 Sampling Event, Oct 2006
Final Facility Wide Groundwater Monitoring Program Annual Report for 2005
Final Facility Wide Groundwater Monitoring Program Report on the July 2005 Sampling Event-Main Report and Appendices A-C, Nov 2005
Final Facility Wide Groundwater Monitoring Program Report on the April 2005 Sampling Event, Aug 2005
Final Facility-Wide Groundwater Monitoring Program Plan for the Ravenna Army Ammunition Plant Ravenna, Ohio. September 2004
Final Calendar Year 2001 Facility-Wide Groundwater Monitoring Well Inspections and Potentiometric Map for RVAAP. Jul-2003
RVAAP-67 Facility-Wide Sewers
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
Final Sampling and Analysis Plan for the Remedial Investigation of RVAAP- 67 Facility-wide Sewers Addendum No. 1 at Ravenna Army Ammunition Plant, July 31, 2009
Final Sampling and Analysis Plan for Groundwater Sampling at RVAAP- 12 Load Line 12 at Ravenna Army Ammunition Plant, Addendum 1, Apr 14, 2009
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008
Buildings W-221 and X-232 (Back to top)
Closure, Final Closure Report Approval for Buildings W-221 and X-232. July 2000
DLA Storage
Final Report for the Assessment of Potential Contamination at the DLA Outdoor Storage Areas, Aug, 2003
RVAAP-01 Ramsdell Quarry Landfill (Back to top)
Final Work Plan for Sampling and Closure of Load Lines 1 -4, 12 (RVAAP- 08, 09, 10, 11, 12) and other Areas of Concern, July 30, 2010
Final Project Management Plan for Sampling and Closure of Load Lines 1 -4, 12 (RVAAP- 08, 09, 10, 11, 12) and other Areas of Concern, July 30, 2010
Final Project Management Plan Performance-Based Acquisition for Six Environmental Areas of Concern, Revision 1, Mar. 1, 2010
Final Remedial Design for the RVAAP- 01 Ramsdell Quarry Landfill at Ravenna Army Ammunition Plant, Jan. 25, 2010
Draft Project Management Plan Performance-Based Acquisition for Six Environmental Areas of Concern, Revision 1 at Ravenna Army Ammunition Plant, Nov. 18, 2009
Final Record of Decision for Soil and Dry Sediment for RVAAP- 01 Ramsdell Quarry Landfill at Ravenna Army Ammunition Plant. Mar 24, 2009
Wetlands and Other Waters Delineation Report Remedial Action Areas at Ramsdell Quarry Landfill, Load Line 12, and Fuze and Booster Quarry Landfill/Ponds at the Ravenna Army Ammunition Plant and Ravenna Training and Logistics Site, Ravenna, Ohio. Dec. 29, 2008
Final Remedial Action Completion Report for the Remediation of Soils and Dry Sediments at RVAAP- 08 Load Line 1, RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, June 30, 2008
Final Proposed Plan for Soil and Dry Sediment at the Ramsdell Quarry Landfill (RVAAP-01) Ravenna Army Ammunition Plant, Ravenna, Ohio. March 2007
Revised Final Feasibility Study for Ramsdell Quarry Landfill (RVAAP-01), Ravenna Army Ammunition Plant, Ravenna, Ohio, October 2006.
Final Sampling and Analysis Plan Addendum No. 2 for the Phase I Remedial Investigation of Ramsdell Quarry Landfill, June 2006
Final Phase I Remedial Investigation Report for Ramsdell Quarry Landfill at the Ravenna Army Ammunition Plant, Ravenna, Ohio September 2005
Final Phase I Remedial Investigation December 2004 Follow-On Groundwater Sampling at RVAAP-01 Ramsdell Quarry Landfill, June 2005
Final Site Safety and Health Plan Addendum No. 1 for the Phase I Remedial Investigation of Ramsdell Quarry Landfill at RVAAP. Oct-2003
Final Sampling and Analysis Plan Addendum No. 1 for the Phase I Remedial Investigation of Ramsdell Quarry Landfill at RVAAP. Oct-2003
Final Final Report on the Groundwater Investigation of the Ramsdell Quarry Landfill. Aug-2000
April 1999 Quarterly Monitoring Report, Ramsdell Quarry Groundwater Investigation, RVAAP. Apr-1999
Final February 1999 Quarterly Monitoring Report, Ramsdell Quarry Groundwater Investigation, at RVAAP. Feb-1999
Final Initial Phase Report, Groundwater Investigation, Ramsdell Quarry Landfill, Ravenna Army Ammunition Plant. Jan-1999
Final October 1998 Quarterly Monitoring Report, Ramsdell Quarry Groundwater Investigation, RVAAP. Oct-1998
Final Sampling and Analysis Plan Addendum for the Groundwater Investigation of the Former Ramsdell Quarry Landfill at the Ravenna Army Ammunition Plant. Jun-1998
Closure, Final Closure Inspection of RVAAP-01 Ramsdell Quarry Landfill. Sept. 1990
RVAAP-02
Erie Burning Grounds (Back to top)
Final Work Plan for Sampling and Closure of Load Lines 1 -4, 12 (RVAAP- 08, 09, 10, 11, 12) and other Areas of Concern, July 30, 2010
Final Project Management Plan for Sampling and Closure of Load Lines 1 -4, 12 (RVAAP- 08, 09, 10, 11, 12) and other Areas of Concern, July 30, 2010
Final Project Management Plan Performance-Based Acquisition for Six Environmental Areas of Concern, Revision 1, Mar. 1, 2010
Draft Project Management Plan Performance-Based Acquisition for Six Environmental Areas of Concern, Revision 1 at Ravenna Army Ammunition Plant, Nov. 18, 2009
Final Record of Decision for Soil and Dry Sediment at the RVAAP-02 Erie Burning Grounds, Sept 19, 2007
Public Presentation for Proposed Plans at Erie Burning Grounds and Open Demolition Area #2, March 13, 2007
Final Proposed Plan for Soil and Dry Sediment at Erie Burning Grounds (RVAAP-02) Ravenna Army Ammunition Plant Ravenna, Ohio February 2007
Final Addendum to the Phase II Remedial Investigation Report for Erie Burning Grounds (RVAAP-02) Ravenna Army Ammunition Plant Ravenna, Ohio. September 2006.
Draft Feasibility Study for Erie Burning Grounds (RVAAP-02) Ravenna Army Ammunition Plant Ravenna, Ohio March 2006
Final Phase II Remedial Investigation Report for Erie Burning Grounds (Rvaap-02) at the Ravenna Army Ammunition Plant, Ravenna, Ohio September 2005
Final Site Safety and Health Plan Addendum No. 1 for the Phase II Remedial Investigation of Erie Burning Grounds At RVAAP. Oct-2003
Final Site Sampling and Analysis Plan Addendum No. 1 for the Phase I Remedial Investigation of Erie Burning Grounds at RVAAP. Oct-2003
Phase
I Remedial Investigation Report for the Erie Burning Grounds
at the Ravenna Army Ammunition Plant, Ravenna, Ohio. Final. December
2001.
Final Sampling and Analysis Plan Addendum No. 1 for the Phase I Remedial Investigation of the Erie Burning Grounds at Ravenna Army Ammunition Plant. Jul-1999
Final Site Safety and Health Plan Addendum No. 1 for the Phase I Remedial Investigation of the Erie Burning Grounds at Ravenna Army Ammunition Plant. Jul-1999
RVAAP-03 Open Demolition Area #1 (Back to top)
Final Work Plan for Sampling and Closure of Load Lines 1 -4, 12 (RVAAP- 08, 09, 10, 11, 12) and other Areas of Concern, July 30, 2010
Final Project Management Plan for Sampling and Closure of Load Lines 1 -4, 12 (RVAAP- 08, 09, 10, 11, 12) and other Areas of Concern, July 30, 2010
Final Sampling and Analysis Plan Addendum No. 1 for Environmental Service at RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1, and RVAAP- 28 Mustard Agent Burial Site, Feb. 11, 2010.
Draft Geophysical Prove-out Report for Environmental Services at RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1, And RVAAP- 28 Mustard Agent Burial Site, Version 1.0, Feb. 5, 2010
Final Safety, Health, and Emergency Response Plan for Environmental Services at RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1, and RVAAP- 28 Mustard Agent Burial Site, Oct. 14, 2009
Final Data Quality Objectives Report for RVAAP- 03 Open Demolition Area #1 at Ravenna Army Ammunition Plant, Oct. 09, 2009
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, September Trip Report (#12), Sept. 2, 2009
Draft Data Quality Objectives Report for RVAAP- 03 Open Demolition Area #1 at Ravenna Army Ammunition Plant, Aug 6, 2009
Final Geophysical Investigation Plan for RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1 and RVAAP- 28 Mustard Agent Burial Site at Ravenna Army Ammunition Plant, Version 1.0, July 16, 2009
Final Phase I Remedial Investigation Report for RVAAP-03 Demolition Area #1 at Ravenna Army Ammunition Plant, Dec, 2001
Final Site Safety and Health Plan Addendum No. 1 for the Phase I Remedial Investigation of Demolition Area #1, Oct 1999
RVAAP-04
Open Demolition Area #2 (Back to top)
Final Work Plan for Sampling and Closure of Load Lines 1 -4, 12 (RVAAP- 08, 09, 10, 11, 12) and other Areas of Concern, July 30, 2010
Final Project Management Plan for Sampling and Closure of Load Lines 1 -4, 12 (RVAAP- 08, 09, 10, 11, 12) and other Areas of Concern, July 30, 2010
Final Project Management Plan Performance-Based Acquisition for Six Environmental Areas of Concern, Revision 1, Mar. 1, 2010
Draft Project Management Plan Performance-Based Acquisition for Six Environmental Areas of Concern, Revision 1 at Ravenna Army Ammunition Plant, Nov. 18, 2009
Final Construction Completion Report Time Critical Response Action for the Rocket Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Military Munitions Response Program, Sep. 23, 2008
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) August 2008 – September 2009, Aug. 26, 2008
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, July Trip Report (#11), July 29, 2009
Addendum to the Final Site Safety and Health Plan, Time Critical Removal Action at the Rocket Ridge Are within RVAAP- 004-R-01 Open Demolition Area #2 MRS at Ravenna Army Ammunition Plant, July 17, 2009
Final Public Involvement Plan Addendum for Rocket Ridge at Ravenna Army Ammunition Plant, 6/30/09
Final Project Work Plan for the Time Critical Removal Action (TCRA) at Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2 at Ravenna Army Ammunition Plant. 6/30/09
Final Project Management Plan for the Time Critical Removal Action (TCRA) at the Rocket Ridge Area of RVAAP-04 Open Demolition Area #2 at Ravenna Army Ammunition Plant, 6/30/09
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Report sTime Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, June Trip Report (#10), 6/24/09
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Report (#3) Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, May Trip Report (#9), May 27, 2009
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Report sTime Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, April Trip Report (#8), Apr 28, 2009
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Report sTime Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, March Trip Report (#7), Mar, 25, 2009
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, December Trip Report (#5), Dec. 16, 2008
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, November Trip Report (#4), Nov 19, 2008
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, OctoberTrip Report, Oct. 23, 2008
Final Construction Completion Report Time Critical Response Action for the Rocket Area of RVAAP- 04 Open Demolition Area #2 Military Munitions Response Program, Sept. 23, 2008
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) August 2008 – September 2009, Aug. 26, 2008
Final Revised Operations and Maintenance Plan Sand Creek Barrier System, Time Critical Response Action Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, Site-Specific Health and Safety Plan, Aug 7, 2008
Final Revised Operations and Maintenance Plan Sand Creek Barrier System, Time Critical Response Action Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, Explosive Site Plan, Aug 7, 2008
Final Revised Operations and Maintenance Plan for the Sand Creek Barrier System, the Time Critical Response Action at the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, Military Munitions Response Program, Aug 7, 2008
Final Time Critical Response Action Plan for the Rocket Ridge Area at Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Military Munitions Response Program, Mar. 1, 2008
Final Work Plan for Sand Creek Survey Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Military Munitions Response Program Time Critical Response Action, Oct. 24, 2007
Final Record of Decision for Soil and Dry Sediment at the RVAAP-04 Open Demolition Area #2, Sept 19, 2007
Public Presentation for Proposed Plans at Erie Burning Grounds and Open Demolition Area #2, March 13, 2007
Final Proposed Plan for Soil and Dry Sediment at Open Demolition Area #2 (RVAAP- 04) Ravenna Army Ammunition Plant Ravenna, Ohio February 2007
Final Addendum to the Phase II Remedial Investigation Report for Open Demolition Area #2 (RVAAP-04) Ravenna Army Ammunition Plant Ravenna, Ohio. September 2006.
Draft Feasibility Study for Open Demolition Area #2 (RVAAP-04) Ravenna Army Ammunition Plant Ravenna, Ohio March 2006
Final Sampling and Analysis Plan Addendum No. 1 Supplemental Phase II Remedial Investigations RVAAP-04 Open Demolition Area #2, RVAAP-16 Fuze and Booster Quarry Landfill/Ponds and RVAAP-49 Central Burn Pits, Nov 2005
Final Phase II Remedial Investigation Report for the Open Demolition Area #2 (RVAAP-04) at the Ravenna Army Ammunition Plant Ravenna, Ohio September 2005
Final Resource Conservation and Recovery Act (RCRA) Closure Field Investigation Report for the Deactivation Furnace Area, Open Detonation Area, Building 1601, and Pesticides Building at RVAAP. Jun-1998
Phase
I Remedial Investigation Report for High Priority Areas of Concern
at the Ravenna Army Ammunition Plant, Ravenna, Ohio. Final.
February 1998.
Final Public Meeting Briefing Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. Sep-1997
Draft Investigation-Derived Waste Characterization and Disposal Plan for the Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. (Note: Have same document title but under the date of Dec-96 in Previous Studies) Dec-1996
Final Phase I Remedial Investigation Site Safety and Health Plan Addendum for High Priority Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Phase I Remedial Investigation Sampling and Analysis Plan Addendum for High Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Quality Control Plan for the Phase I Remedial Investigation for High Areas of Concern at RVAAP. Jun-1996
RVAAP-05
Winklepeck Burning Grounds (Back to top)
Final Remedial Action Completion Report for RVAAP- 05 Winklepeck Burning Grounds Pads 61/61A, 67, and 70 at Ravenna Army Ammunition Plant, Nov 19, 2009
Final Contractor Quality Control Plan for the Remedial Action at RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Nov. 17, 2008
Final Project Management Plan for RVAAP-05 Winklepeck Burning Grounds Remedial Design/Remedial Action, Revision 2, Sept 4 2008
Final Record of Decision for Soil and Dry Sediment at RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Aug. 6, 2008
Final Remedial Action Work Plan for RVAAP-05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, July 27, 2008
Final Project Completion Report for the Munitions Response for Demolition of Load Lines 5, 7, Building 1039, and Transite Removal at Building T-1604, Volume 1 Main Text and Appendices A-C, Dec 13, 2007
Revised Final Report On The Biological Field-Truthing Effort At Winklepeck Burning Grounds At Ravenna Army Ammunition Plant, Ravenna, Ohio. August 2006
Final Sampling and Analysis Plan Addendum No. 2 for RVAAP-05 Winklepeck Burning Grounds Feasibility Study, Feb, 2006
Final Proposed Plan for the Winklepeck Burning Grounds, Ravenna Army Ammunition Plant, Ravenna, Ohio. December 2005.
Revised Final Focused Feasibility Study for RVAAP-05 Winklepeck Burning Grounds, Mar, 2005
Final Phase II Remedial Investigation Report for the Winklepeck Burning Grounds at RVAAP. April 2001.
Final Sampling and Analysis Plan and Site Safety and Health Plan Addendum No. 1 for the Winklepeck Burning Grounds Feasibility Study. Oct-2000
Draft Sampling and Analysis Plan and Site Safety and Health Plan Addendum No. 2 for the Biological Measurements at RVAAP-05 Winklepeck Burning Grounds, May 2000
Closure, Completion of Partial Closure of RVAAP-07 Building 1601 Hazardous Waste Storage and RVAAP-05 Winklepeck Burning Grounds (OBG). May, 1999
Final Resource Conservation and Recovery Act (RCRA) Closure Field Investigation Report for the Deactivation Furnace Area, Open Detonation Area, Building 1601, and Pesticides Building at RVAAP. Jun-1998
Final Sampling and Analysis Plan Addendum for the Phase II Remedial Investigation of the Winklepeck Burning Grounds and Determination of Facility-Wide Background at the Ravenna Army Ammunition Plant. Apr-1998
Phase
I Remedial Investigation Report for High Priority Areas of Concern
at the Ravenna Army Ammunition Plant, Ravenna, Ohio. Final. February
1998
Final Public Meeting Briefing Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. Sep-1997
Draft Investigation-Derived Waste Characterization and Disposal Plan for the Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. (Note: Have same document title but under the date of Dec-96 in Previous Studies) Dec-1996
Final Phase I Remedial Investigation Site Safety and Health Plan Addendum for High Priority Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Phase I Remedial Investigation Sampling and Analysis Plan Addendum for High Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Quality Control Plan for the Phase I Remedial Investigation for High Areas of Concern at RVAAP. Jun-1996
RVAAP-06
C Block Quarry (Back to top)
Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
Draft PBA 2008 Suppliemental Investigation Sampling and Analysis Plan Addendum No. 1, Feb 4, 2009
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008a
Final Characterization of 14 AOCs at Ravenna Army Ammunition Plant, March 2007.
Final Sampling and Analysis Plan Addendum for the Characterization of 14 RVAAP AOCs at RVAAP Oct. 2004
RVAAP-07
Building 1601 (Back to top)
Closure, Completion of Partial Closure of RVAAP-07 Building 1601 Hazardous Waste Storage and RVAAP-05 Winklepeck Burning Grounds (OBG). May 1999
RVAAP-08
Load Line 1 (Back to top)
Draft Sampling and Analysis of Soils Below Floor Slabs at RVAAP- 08 Load Line 1 and Other Building Locations, Mar. 15, 2010
Final Work Plan Addendum 1 for the Sampling of Soils Below Floor Slabs and Remediation at RVAAP- 08 Load Line 1 and Other Building Locations at Ravenna Army Ammunition Plant, Aug. 3, 2009
Draft Site-Specific Work Plan for the RVAAP- 08 Load Line 1 Igniter Tube Disposal at Ravenna Army Ammunition Plant, Oct 2, 2008
Final Remedial Action Completion Report for the Remediation of Soils and Dry Sediments at RVAAP- 08 Load Line 1, RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, June 30, 2008
Final of the Work Plan for the Sampling of Soils Below Floor Slabs at Load Lines 2-4 and Excavation and Transportation of Contaminated Soils to Load Line 4 (Buildings G-1, G-1A, and G-3), May 29, 2008
Draft Interim Action Completion Report for the Remediation of Soils at RVAAP- 08, 09, 10 and 11, Load Lines 1- 4, May 12, 2008
Final Stormwater Pollution Prevention Plan Remediation of Soils at RVAAP-08, 09, 10, and 11, Load Lines 1-4. July 12, 2007. Shaw.
Final Safety, Health and Emergency Response Plan Addendum for the Remediation of Soils at Load Lines 1, 2, 3, and 4, June 2007
Final Remedial Action Work Plan Remediation of Soils at Load Lines 1- 4 (RVAAP- 08, 09, 10, and 11) 4/5/2007
Final Revised Interim Record of Decision for the Remediation of Soils at RVAAP-08, 09, 10, 11 Load Lines 1 – 4, Jan.18, 2007
Proposed Plan for the Remediation of Soils at Load Lines 1 through 4 at the Ravenna Army Ammunition Plant Ravenna, Ohio, July 2005.
Final Supplemental Baseline Human Health Risk Assessment for Load Line Alternative Receptors at RVAAP. Jul-2004
Final Focused Feasibility Study for the Remediation of Soils at LLs 1-4, RVAAP May 2005
Final Proposed Remedial Goal Options for Soil at RVAAP- 08, 09, 10, and 11 Load Lines 1- 4, Sept. 2004
Phase
II Remedial Investigation for the Load Line 1 at the Ravenna
Army Ammunition Plant, Ravenna, Ohio. DACA62-00-D-0001, DO CY09,
Final. June 2003.
Final Revised Final Technical Memorandum Human Health and Ecological Risk Assessment Approach for the Load Line 1 and Load Line 12 Phase II Remedial Investigations at RVAAP. Aug-2002
Final Sampling and Analysis Plan Addendum No. 2 for the Phase II Remedial Investigation of Load Line 1 at RVAAP. Sep-2000
Final Sampling and Analysis
Plan and Site Safety and Health Plant Addendum No. 1 for the Phase
II Remedial Investigation of Load Line 1 at the Ravenna Army Ammunition
Plant, Ravenna, Ohio, DACA27-97-D-0025, DO 0005. August 1999
Phase
I Remedial Investigation Report for High Priority Areas of Concern
at the Ravenna Army Ammunition Plant, Ravenna, Ohio. Final. February
1998
Final Public Meeting Briefing Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. Sep-1997
Draft Investigation-Derived Waste Characterization and Disposal Plan for the Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. (Note: Have same document title but under the date of Dec-96 in Previous Studies) Dec-1996
Final Phase I Remedial Investigation Site Safety and Health Plan Addendum for High Priority Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Phase I Remedial Investigation Sampling and Analysis Plan Addendum for High Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Quality Control Plan for the Phase I Remedial Investigation for High Areas of Concern at RVAAP. Jun-1996
RVAAP-09 Load Line 2 (Back to top)
Final Multi-Increment Sampling and Analysis of Soils Below Floor Slabs at RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, Dec. 04, 2009
Draft of the Multi-Increment Sampling and Analysis of Soils Below Floor Slabs at RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, Dec. 4, 2008
Draft of the Sampling and Screening Analysis of Soils Below Floor Slabs at RVAAP- 09 Load Lines 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4, Version 2.0, at Ravenna Army Ammunition Plant, Dec. 01. 2008
Final Remedial Action Completion Report for the Remediation of Soils and Dry Sediments at RVAAP- 08 Load Line 1, RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, June 30, 2008
Final of the Work Plan for the Sampling of Soils Below Floor Slabs at Load Lines 2-4 and Excavation and Transportation of Contaminated Soils to Load Line 4 (Buildings G-1, G-1A, and G-3), May 29, 2008
Draft Interim Action Completion Report for the Remediation of Soils at RVAAP- 08, 09, 10 and 11, Load Lines 1- 4, May 12, 2008
Draft of the Preliminary Evaluation of Pre (Floor Slab Removal) Contamination Beneath Selected Buildings at Load Lines 2, 3, and 4, Apr 2008
Final Project Coordination Plan for the Sampling of Soils Below Floor Slabs at RVAAP- 09, 10, and 11 Load Lines 2, 3, and 4 and excavation and Transportation of Contaminated Soils to RVAAP- 11 Load Line 4 (Buildings G-1, G-1A and G-3),
Mar 13, 2008
Final Letter Report Work Plan for the Sampling of Soils Below Floor Slabs at RVAAP- 09, 10, and 11 Load Lines 2, 3, and 4 and Excavation and Transportation of Contaminated Soils to RVAAP- 11 Load Line 4 (Buildings G-1, G-1A and G-3) Feb.2008
Final Stormwater Pollution Prevention Plan Remediation of Soils at RVAAP-08, 09, 10, and 11, Load Lines 1-4. July 12, 2007. Shaw.
Final Safety, Health and Emergency Response Plan Addendum for the Remediation of Soils at Load Lines 1, 2, 3, and 4, June 2007
Final Remedial Action Work Plan Remediation of Soils at Load Lines 1- 4 (RVAAP- 08, 09, 10, and 11) 4/5/2007
Final Revised Interim Record of Decision for the Remediation of Soils at RVAAP-08, 09, 10, 11 Load Lines 1 – 4, Jan.18, 2007
Final Proposed Plan for the Remediation of Soils at Load Lines 1 through 4 at the Ravenna Army Ammunition Plant Ravenna, Ohio, July 2005
Final Focused Feasibility Study for the Remediation of Soils at LLs 1-4, RVAAP May 2005
Final Proposed Remedial Goal Options for Soil at RVAAP- 08, 09, 10, and 11 Load Lines 1- 4, Sept. 2004
Phase II
Remedial Investigation Report for Load Line 2 at the Ravenna Army
Ammunition Plant, Ravenna, Ohio. Final July 2004
Final Sampling and Analysis Plan Addendum No. 1 for the Phase II Remedial Investigation of Load Lines 2, 3, and 4 at RVAAP. Jul-2001
Final Site Safety and Health Plan Addendum No. 1 for the Phase II Remedial Investigation of Load Lines 2, 3, and 4 at RVAAP. Jul-2001
Phase
I Remedial Investigation Report for High Priority Areas of Concern
at the Ravenna Army Ammunition Plant, Ravenna, Ohio. Final. February
1998
Final Public Meeting Briefing Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. Sep-1997
Draft Investigation-Derived Waste Characterization and Disposal Plan for the Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. (Note: Have same document title but under the date of Dec-96 in Previous Studies) Dec-1996
Final Phase I Remedial Investigation Site Safety and Health Plan Addendum for High Priority Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Phase I Remedial Investigation Sampling and Analysis Plan Addendum for High Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Quality Control Plan for the Phase I Remedial Investigation for High Areas of Concern at RVAAP. Jun-1996
RVAAP-10 Load Line 3 (Back to top)
Draft Sampling and Analysis of Soils Below Floor Slabs at RVAAP- 08 Load Line 1 and Other Building Locations, Mar. 15, 2010
Final Multi-Increment Sampling and Analysis of Soils Below Floor Slabs at RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, Dec. 04, 2009
Draft of the Multi-Increment Sampling and Analysis of Soils Below Floor Slabs at RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, Dec. 4, 2008
Draft of the Sampling and Screening Analysis of Soils Below Floor Slabs at RVAAP- 09 Load Lines 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4, Version 2.0, at Ravenna Army Ammunition Plant, Dec. 01. 2008
Final Remedial Action Completion Report for the Remediation of Soils and Dry Sediments at RVAAP- 08 Load Line 1, RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, June 30, 2008
Final of the Work Plan for the Sampling of Soils Below Floor Slabs at Load Lines 2-4 and Excavation and Transportation of Contaminated Soils to Load Line 4 (Buildings G-1, G-1A, and G-3), May 29, 2008
Draft Interim Action Completion Report for the Remediation of Soils at RVAAP- 08, 09, 10 and 11, Load Lines 1- 4, May 12, 2008
Draft of the Preliminary Evaluation of Pre (Floor Slab Removal) Contamination Beneath Selected Buildings at Load Lines 2, 3, and 4, Apr 2008
Final Project Coordination Plan for the Sampling of Soils Below Floor Slabs at RVAAP- 09, 10, and 11 Load Lines 2, 3, and 4 and excavation and Transportation of Contaminated Soils to RVAAP- 11 Load Line 4 (Buildings G-1, G-1A and G-3),
Mar 13, 2008
Final Letter Report Work Plan for the Sampling of Soils Below Floor Slabs at RVAAP- 09, 10, and 11 Load Lines 2, 3, and 4 and Excavation and Transportation of Contaminated Soils to RVAAP- 11 Load Line 4 (Buildings G-1, G-1A and G-3) Feb.2008
Final Stormwater Pollution Prevention Plan Remediation of Soils at RVAAP-08, 09, 10, and 11, Load Lines 1-4. July 12, 2007. Shaw.
Final Safety, Health and Emergency Response Plan Addendum for the Remediation of Soils at Load Lines 1, 2, 3, and 4, June 2007
Final Remedial Action Work Plan Remediation of Soils at Load Lines 1- 4 (RVAAP- 08, 09, 10, and 11) 4/5/2007
Final Revised Interim Record of Decision for the Remediation of Soils at RVAAP-08, 09, 10, 11 Load Lines 1 – 4, Jan.18, 2007
Proposed Plan for the Remediation of Soils at Load Lines 1 through 4 at the Ravenna Army Ammunition Plant Ravenna, Ohio, July 2005
Final Focused Feasibility Study for the Remediation of Soils at LLs 1-4, RVAAP May 2005
Final Proposed Remedial Goal Options for Soil at RVAAP- 08, 09, 10, and 11 Load Lines 1- 4, Sept. 2004
Phase II Remedial
Investigation Report for Load Line 3 at the Ravenna Army Ammunition
Plant, Ravenna, Ohio. Final. July 2004
Final Sampling and Analysis Plan Addendum No. 1 for the Phase II Remedial Investigation of Load Lines 2, 3, and 4 at RVAAP. Jul-2001
Final Site Safety and Health Plan Addendum No. 1 for the Phase II Remedial Investigation of Load Lines 2, 3, and 4 at RVAAP. Jul-2001
Phase
I Remedial Investigation Report for High Priority Areas of Concern
at the Ravenna Army Ammunition Plant, Ravenna, Ohio. Final. February
1998
Final Public Meeting Briefing Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. Sep-1997
Draft Investigation-Derived Waste Characterization and Disposal Plan for the Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. (Note: Have same document title but under the date of Dec-96 in Previous Studies) Dec-1996
Final Phase I Remedial Investigation Site Safety and Health Plan Addendum for High Priority Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Phase I Remedial Investigation Sampling and Analysis Plan Addendum for High Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Quality Control Plan for the Phase I Remedial Investigation for High Areas of Concern at RVAAP. Jun-1996
RVAAP-11 Load Line 4 (Back to top)
Draft Sampling and Analysis of Soils Below Floor Slabs at RVAAP- 08 Load Line 1 and Other Building Locations, Mar. 15, 2010
Final Multi-Increment Sampling and Analysis of Soils Below Floor Slabs at RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, Dec. 04, 2009
Draft of the Multi-Increment Sampling and Analysis of Soils Below Floor Slabs at RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, Dec. 4, 2008
Draft of the Sampling and Screening Analysis of Soils Below Floor Slabs at RVAAP- 09 Load Lines 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4, Version 2.0, at Ravenna Army Ammunition Plant, Dec. 01. 2008
Final Remedial Action Completion Report for the Remediation of Soils and Dry Sediments at RVAAP- 08 Load Line 1, RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, June 30, 2008
Final of the Work Plan for the Sampling of Soils Below Floor Slabs at Load Lines 2-4 and Excavation and Transportation of Contaminated Soils to Load Line 4 (Buildings G-1, G-1A, and G-3), May 29, 2008
Draft Interim Action Completion Report for the Remediation of Soils at RVAAP- 08, 09, 10 and 11, Load Lines 1- 4, May 12, 2008
Draft of the Preliminary Evaluation of Pre (Floor Slab Removal) Contamination Beneath Selected Buildings at Load Lines 2, 3, and 4, Apr 2008
Final Project Coordination Plan for the Sampling of Soils Below Floor Slabs at RVAAP- 09, 10, and 11 Load Lines 2, 3, and 4 and excavation and Transportation of Contaminated Soils to RVAAP- 11 Load Line 4 (Buildings G-1, G-1A and G-3),
Mar 13, 2008
Final Letter Report Work Plan for the Sampling of Soils Below Floor Slabs at RVAAP- 09, 10, and 11 Load Lines 2, 3, and 4 and Excavation and Transportation of Contaminated Soils to RVAAP- 11 Load Line 4 (Buildings G-1, G-1A and G-3) Feb.2008
Final Stormwater Pollution Prevention Plan Remediation of Soils at RVAAP-08, 09, 10, and 11, Load Lines 1-4. July 12, 2007. Shaw.
Final Safety, Health and Emergency Response Plan Addendum for the Remediation of Soils at Load Lines 1, 2, 3, and 4, June 2007
Final Remedial Action Work Plan Remediation of Soils at Load Lines 1- 4 (RVAAP- 08, 09, 10, and 11) 4/5/2007
Final Revised Interim Record of Decision for the Remediation of Soils at RVAAP-08, 09, 10, 11 Load Lines 1 – 4, Jan.18, 2007
Proposed Plan for the Remediation of Soils at Load Lines 1 through 4 at the Ravenna Army Ammunition Plant Ravenna, Ohio, July 2005
Final Focused Feasibility Study for the Remediation of Soils at LLs 1-4, RVAAP May 2005
Final Proposed Remedial Goal Options for Soil at RVAAP- 08, 09, 10, and 11 Load Lines 1- 4, Sept. 2004
Final Phase II Remedial Investigation Report for Load Line 4 at RVAAP. Sep-2004
Final Sampling and Analysis Plan Addendum No. 1 for the Phase II Remedial Investigation of Load Lines 2, 3, and 4 at RVAAP. Jul-2001
Final Site Safety and Health Plan Addendum No. 1 for the Phase II Remedial Investigation of Load Lines 2, 3, and 4 at RVAAP. Jul-2001
Phase
I Remedial Investigation Report for High Priority Areas of Concern
at the Ravenna Army Ammunition Plant, Ravenna, Ohio. Final. February
1998
Final Public Meeting Briefing Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. Sep-1997
Draft Investigation-Derived Waste Characterization and Disposal Plan for the Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. (Note: Have same document title but under the date of Dec-96 in Previous Studies) Dec-1996
Final Phase I Remedial Investigation Site Safety and Health Plan Addendum for High Priority Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Phase I Remedial Investigation Sampling and Analysis Plan Addendum for High Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Quality Control Plan for the Phase I Remedial Investigation for High Areas of Concern at RVAAP. Jun-1996
RVAAP-12
Load Line 12 (Back to top)
Final Work Plan for Sampling and Closure of Load Lines 1 -4, 12 (RVAAP- 08, 09, 10, 11, 12) and other Areas of Concern, July 30, 2010
Final Project Management Plan for Sampling and Closure of Load Lines 1 -4, 12 (RVAAP- 08, 09, 10, 11, 12) and other Areas of Concern, July 30, 2010
Final Project Management Plan Performance-Based Acquisition for Six Environmental Areas of Concern, Revision 1, Mar. 1, 2010
Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009
Draft Project Management Plan Performance-Based Acquisition for Six Environmental Areas of Concern, Revision 1 at Ravenna Army Ammunition Plant, Nov. 18, 2009
Remedial Design for RVAAP- 12 Load Line 12 at Ravenna Army Ammunition Plant, Oct. 1, 2009
Draft Feasibility Study for Groundwater at RVAAP- 12 Load Line 12 at Ravenna Army Ammunition Plant, Sept. 28, 2009
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
Draft Remedial Design for RVAAP- 12 Load Line 12 at Ravenna Army Ammunition Plant, July 13, 2009
Final Sampling and Analysis Plan for Groundwater Sampling at RVAAP- 12 Load Line 12 at Ravenna Army Ammunition Plant, Addendum 1, Apr 14, 2009
Final Record of Decision for Soil and Dry Sediment for RVAAP- 12 Load Line 12 at Ravenna Army Ammunition Plant. Mar 20, 2009
Draft PBA 2008 Suppliemental Investigation Sampling and Analysis Plan Addendum No. 1, Feb 4, 2009
Draft Sampling and Analysis Plan for Groundwater Sampling at RVAAP- 12 Load Line 12 at Ravenna Army Ammunition Plant, Addendum 1, Jan. 16, 2009
Wetlands and Other Waters Delineation Report Remedial Action Areas at Ramsdell Quarry Landfill, Load Line 12, and Fuze and Booster Quarry Landfill/Ponds at the Ravenna Army Ammunition Plant and Ravenna Training and Logistics Site, Ravenna, Ohio. Dec. 29, 2008
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008
Final Characterization of 14 AOCs at Ravenna Army Ammunition Plant, March 2007.
Final Proposed Plan for Soil and Dry Sediment at Load Line 12 (RVAAP-12) Ravenna Army Ammunition Plant, Ravenna, Ohio. March 2007
Final Feasibility Study for Load Line 12 (RVAAP-12) Ravenna Army Ammunition Plant Ravenna, Ohio July 2006
Final Phase II Remedial Investigation Supplemental Report for Load Line 12 (Rvaap-12) at the Ravenna Army Ammunition Plant, Ravenna, Ohio November 2005
Final Sampling and Analysis Plan Addendum for the Characterization of 14 RVAAP AOCs at RVAAP Oct. 2004
Phase
II Remedial Investigation Report for Load Line 12 at the Ravenna Army
Ammunition Plant, Ravenna, Ohio. DACA62-00-D-0001, DO CY06,
Final. March 2004.
Final Revised Final Technical Memorandum Human Health and Ecological Risk Assessment Approach for the Load Line 1 and Load Line 12 Phase II Remedial Investigations at RVAAP. Aug-2002
Final Sampling and Analysis Plan Addendum No. 1 for the Phase II Remedial Investigation of Load Line 12 at Ravenna Army Ammunition Plant. Sep-2000
Final Site Safety and Health Plan Addendum No. 1 for the Phase II Remedial Investigation of RVAAP-12 Load Line 12, Sept, 2000
Phase
I Remedial Investigation Report for High Priority Areas of Concern
at the Ravenna Army Ammunition Plant, Ravenna, Ohio. Final. February
1998
Final Public Meeting Briefing Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. Sep-1997
Draft Investigation-Derived Waste Characterization and Disposal Plan for the Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. (Note: Have same document title but under the date of Dec-96 in Previous Studies) Dec-1996
Final Phase I Remedial Investigation Site Safety and Health Plan Addendum for High Priority Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Phase I Remedial Investigation Sampling and Analysis Plan Addendum for High Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Quality Control Plan for the Phase I Remedial Investigation for High Areas of Concern at RVAAP. Jun-1996
RVAAP-13
Building 1200 (Back to top)
Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
Draft PBA 2008 Suppliemental Investigation Sampling and Analysis Plan Addendum No. 1, Feb 4, 2009
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008
Final Characterization of 14 AOCs at Ravenna Army Ammunition Plant, March 2007.
Final Sampling and Analysis Plan Addendum for the Characterization of 14 RVAAP AOCs at RVAAP Oct. 2004
Phase
I Remedial Investigation Report for High Priority Areas of Concern
at the Ravenna Army Ammunition Plant, Ravenna, Ohio. Final. February
1998
Final Public Meeting Briefing Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. Sep-1997
Draft Investigation-Derived Waste Characterization and Disposal Plan for the Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. (Note: Have same document title but under the date of Dec-96 in Previous Studies) Dec-1996
Final Phase I Remedial Investigation Site Safety and Health Plan Addendum for High Priority Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Phase I Remedial Investigation Sampling and Analysis Plan Addendum for High Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Quality Control Plan for the Phase I Remedial Investigation for High Areas of Concern at RVAAP. Jun-1996
RVAAP-14 Load Line 6 Evaporation Unit
(Back to top)
Closure, Completion of Closure for RVAAP-14 Load Line 6 Evaporation Unit. January 1993
RVAAP-16 Fuze and Booster Quarry Landfill/Ponds
(Back to top)
Final Remedial Action Report for the RVAAP- 16 Fuze and Booster Quarry Landfill/Ponds. Mar. 5, 2010
Final Project Management Plan Performance-Based Acquisition for Six Environmental Areas of Concern, Revision 1, Mar. 1, 2010
Draft Project Management Plan Performance-Based Acquisition for Six Environmental Areas of Concern, Revision 1 at Ravenna Army Ammunition Plant, Nov. 18, 2009
Final Remedial Design for RVAAP- 16 Fuze and Booster Quarry Landfill Ponds at Ravenna Army Ammunition Plant, 6/26/09
Draft Remedial Design for RVAAP- 16 Fuze and Booster Quarry Landfill Ponds at Ravenna Army Ammunition Plant. Feb 26, 2009
Wetlands and Other Waters Delineation Report Remedial Action Areas at Ramsdell Quarry Landfill, Load Line 12, and Fuze and Booster Quarry Landfill/Ponds at the Ravenna Army Ammunition Plant and Ravenna Training and Logistics Site, Ravenna, Ohio. Dec. 29, 2008
Final Record of Decision for Soil and Dry Sediment at the RVAAP-16 Fuze and Booster Quarry Landfill/Ponds, Sept 19, 2007
Final Proposed Plan for Soil and Dry Sediment at Fuze and Booster Quarry Landfill/Ponds (RVAAP-16) Ravenna Army Ammunition Plant, Ravenna, Ohio. March 2007
Final Feasibility Study for Fuze and Booster Quarry Landfill/Ponds (RVAAP-16) Ravenna Army Ammunition Plant Ravenna, Ohio July 2006
Final Sampling and Analysis Plan Addendum No. 1 Supplemental Phase II Remedial Investigations RVAAP-04 Open Demolition Area #2, RVAAP-16 Fuze and Booster Quarry Landfill/Ponds and RVAAP-49 Central Burn Pits, Nov 2005
Final Phase I/Phase II Remedial Investigation of the Fuze and Booster Quarry Landfill/Ponds (RVAAP-16) Ravenna Army Ammunition Plant Ravenna, Ohio November 2005
RVAAP-17 Deactivation Furnace (Back to top)
Final Resource Conservation and Recovery Act (RCRA) Closure Field Investigation Report for the Deactivation Furnace Area, Open Detonation Area, Building 1601, and Pesticides Building at RVAAP. Jun-1998
RVAAP-18
Load Line 12 Pink Waste Water Treatment (Back to top)
Phase
I Remedial Investigation Report for High Priority Areas of Concern
at the Ravenna Army Ammunition Plant, Ravenna, Ohio. Final. February
1998
Final Public Meeting Briefing Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. Sep-1997
Draft Investigation-Derived Waste Characterization and Disposal Plan for the Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. (Note: Have same document title but under the date of Dec-96 in Previous Studies) Dec-1996
Final Phase I Remedial Investigation Site Safety and Health Plan Addendum for High Priority Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Phase I Remedial Investigation Sampling and Analysis Plan Addendum for High Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Quality Control Plan for the Phase I Remedial Investigation for High Areas of Concern at RVAAP. Jun-1996
RVAAP-19
Landfill North of Winklepeck Burning Grounds (Back to top)
Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
Draft PBA 2008 Suppliemental Investigation Sampling and Analysis Plan Addendum No. 1, Feb 4, 2009
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008
Final Characterization of 14 AOCs at Ravenna Army Ammunition Plant, March 2007.
Final Sampling and Analysis Plan Addendum for the Characterization of 14 RVAAP AOCs at RVAAP Oct. 2004
Phase
I Remedial Investigation Report for High Priority Areas of Concern
at the Ravenna Army Ammunition Plant, Ravenna, Ohio. Final. February
1998
Final Public Meeting Briefing Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. Sep-1997
Draft Investigation-Derived Waste Characterization and Disposal Plan for the Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. (Note: Have same document title but under the date of Dec-96 in Previous Studies) Dec-1996
Final Phase I Remedial Investigation Site Safety and Health Plan Addendum for High Priority Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Phase I Remedial Investigation Sampling and Analysis Plan Addendum for High Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Quality Control Plan for the Phase I Remedial Investigation for High Areas of Concern at RVAAP. Jun-1996
RVAAP-27
Building 854-PCB Storage (Back to top)
Closure, No Further Action for RVAAP-27 Building 854-PCB Storage. Sept. 1999
RVAAP-28
Mustard Agent Burial Site (Back to top)
Final Sampling and Analysis Plan Addendum No. 1 for Environmental Service at RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1, and RVAAP- 28 Mustard Agent Burial Site, Feb. 11, 2010.
Draft Geophysical Prove-out Report for Environmental Services at RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1, And RVAAP- 28 Mustard Agent Burial Site, Version 1.0, Feb. 5, 2010
Final Safety, Health, and Emergency Response Plan for Environmental Services at RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1, and RVAAP- 28 Mustard Agent Burial Site, Oct. 14, 2009
Final Geophysical Investigation Plan for RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1 and RVAAP- 28 Mustard Agent Burial Site at Ravenna Army Ammunition Plant, Version 1.0, July 16, 2009
Final Data Quality Objectives for the RVAAP- 28 Mustard Agent Burial Site at Ravenna Army Ammunition Plant, Version 1.0, May 11, 2009
Final Report on the Geophysical Investigation of RVAAP-28 the Suspected Mustard Agent Burial Site. May 21, 2008
Final Report on the Additional Groundwater Monitoring Well Installation and Groundwater Sampling at the Suspected RVAAP-28 Mustard Agent Burial Site, May 2006
Final Work Plan and Sampling and Analysis Addenda for the Groundwater Monitoring Well Installation and Groundwater Sampling at the Suspected RVAAP-28 Mustard Agent Burial Site, Nov 2004
Final RVAAP Geophysical Survey Results, Suspected Mustard Agent Burial Site (RVAAP-28). (RVAAP Mustard Agent Letters) Apr-1998
RVAAP-29 Upper and Lower Cobbs Ponds (Back to top)
Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
Draft PBA 2008 Suppliemental Investigation Sampling and Analysis Plan Addendum No. 1, Feb 4, 2009
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008
Final Phase II Remedial Investigation at the Upper and Lower Cobbs Pond (AOC 29) September 2005
Phase
I Remedial Investigation Report for High Priority Areas of Concern
at the Ravenna Army Ammunition Plant, Ravenna, Ohio. Final. February
1998
Final Public Meeting Briefing Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. Sep-1997
Draft Investigation-Derived Waste Characterization and Disposal Plan for the Phase I Remedial Investigation of High Priority Areas of Concern at the Ravenna Army Ammunition Plant. (Note: Have same document title but under the date of Dec-96 in Previous Studies) Dec-1996
Final Phase I Remedial Investigation Site Safety and Health Plan Addendum for High Priority Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Phase I Remedial Investigation Sampling and Analysis Plan Addendum for High Areas of Concern for the Ravenna Army Ammunition Plant. Jul-1996
Final Quality Control Plan for the Phase I Remedial Investigation for High Areas of Concern at RVAAP. Jun-1996
RVAAP-33 Load Line 6 (Back to top)
Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
Draft PBA 2008 Suppliemental Investigation Sampling and Analysis Plan Addendum No. 1, Feb 4, 2009
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008
Final Report for the Phase I Remedial Investigation of RVAAP-33 Load Line 6, Volume 1- 4, Aug 2007
RVAAP-34 Sand Creek Disposal Road Landfill (Back to top)
Final Geophysical Prove-out Report for Environmental Services at RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1, And RVAAP- 28 Mustard Agent Burial Site, Version 1.0, March 25, 2010.
Final Sampling and Analysis Plan Addendum No. 1 for Environmental Service at RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1, and RVAAP- 28 Mustard Agent Burial Site, Feb. 11, 2010.
Final Data Quality Objectives for the RVAAP- 34 Sand Creek Disposal Road Landfill at Ravenna Army Ammunition Plant, Version 1.0, July 16, 2009
Final Geophysical Investigation Plan for RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1 and RVAAP- 28 Mustard Agent Burial Site at Ravenna Army Ammunition Plant, Version 1.0, July 16, 2009
Final Remedial Design/Removal Action Plan for RVAAP- 34 Sand Creek Disposal Road Landfill at Ravenna Army Ammunition Plant 3/21/2004
RVAAP-35 Bldg. 1037 Laundry (Back to top)
RVAAP-36 Pistol Range (Back to top)
Final Characterization of 14 AOCs at Ravenna Army Ammunition Plant, March 2007.
Final Sampling and Analysis Plan Addendum for the Characterization of 14 RVAAP AOCs at RVAAP Oct. 2004
RVAAP-37 Pesticide Storage Building T-4452 (Back to top
Closure, Final Closure Report for RVAAP-37 Pesticide Storage Building T-4452. Sept. 2000
Final Resource Conservation and Recovery Act (RCRA) Closure Field Investigation Report for the Deactivation Furnace Area, Open Detonation Area, Building 1601, and Pesticides Building at RVAAP. Jun-1998
RVAAP-38
NACA Test Area (Back to top)
Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
Draft PBA 2008 Suppliemental Investigation Sampling and Analysis Plan Addendum No. 1, Feb 4, 2009
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008
Final Project Completion Report for the Munitions Response for Demolition of Load Lines 5, 7, Building 1039, and Transite Removal at Building T-1604, Volume 1 Main Text and Appendices A-C, Dec 13, 2007
Final Characterization of 14 AOCs at Ravenna Army Ammunition Plant, March 2007.
Phase
I Remedial Investigation Report for the NACA Test Area at the
Ravenna Army Ammunition Plant, Ravenna, Ohio. Final. December 2004
Final Sampling and Analysis Plan Addendum for the Characterization of 14 RVAAP AOCs at RVAAP Oct. 2004
Final Site Safety and Health Plan Addendum No. 1 for the Phase I Remedial Investigation of the NACA Test Area at RVAAP. Oct-1999
Final Sampling and Analysis Plan Addendum No. 1 for the Phase I Remedial Investigation of the NACA Test Area at RVAAP. Oct-1999
RVAAP-39
Load Line 5 (Back to top)
Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
Draft PBA 2008 Suppliemental Investigation Sampling and Analysis Plan Addendum No. 1, Feb 4, 2009
Final Investigation of the Under Slab Soils Post Slab and Foundation Removal at RVAAP- 39 Load Lines 5, RVAAP- 40 Load Line 7, RVAAP- 41 Load Line 8, and RVAAP- 43 Load Line 10, Jan. 09, 2009
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008
Final Sampling and Analysis Plan and the Site Safety and Health Plan for the Exposed Soil Sampling and Characterization After Slab and Foundation Removals at RVAAP-39 Load Line 5, RVAAP-40 Load Line 7, RVAAP-41 Load Line 8, and RVAAP-43 Load Line 10, Aug. 1, 2007
Final Characterization of 14 AOCs at Ravenna Army Ammunition Plant, March 2007.
Final Sampling and Analysis Plan Addendum for the Characterization of 14 RVAAP AOCs at RVAAP Oct. 2004
Hazardous and Medical Waste Study No. 37-EF-5360-99 Relative Risk Site Evaluation for Newly Added Sites. October 1998
RVAAP-40
Load Line 7 (Back to top)
Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
Draft PBA 2008 Suppliemental Investigation Sampling and Analysis Plan Addendum No. 1, Feb 4, 2009
Final Investigation of the Under Slab Soils Post Slab and Foundation Removal at RVAAP- 39 Load Lines 5, RVAAP- 40 Load Line 7, RVAAP- 41 Load Line 8, and RVAAP- 43 Load Line 10, Jan. 09, 2009
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008
Final Project completion Report for the Munitions Response for Demolition of Load Lines 5, 7, Building 1039, and Transite Removal at Building T-1604, Removal of Remaining Concrete and Miscellaneous Debris at Load Lines 6, 9 and 11. Dec. 13, 2007
Final Sampling and Analysis Plan and the Site Safety and Health Plan for the Exposed Soil Sampling and Characterization After Slab and Foundation Removals at RVAAP-39 Load Line 5, RVAAP-40 Load Line 7, RVAAP-41 Load Line 8, and RVAAP-43 Load Line 10, Aug. 1, 2007
Final Characterization of 14 AOCs at Ravenna Army Ammunition Plant, March 2007.
Final Sampling and Analysis Plan Addendum for the Characterization of 14 RVAAP AOCs at RVAAP Oct. 2004
Hazardous and Medical Waste Study No. 37-EF-5360-99 Relative Risk Site Evaluation for Newly Added Sites. October 1998
RVAAP-41
Load Line 8 (Back to top)
Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
Draft PBA 2008 Suppliemental Investigation Sampling and Analysis Plan Addendum No. 1, Feb 4, 2009
Final Investigation of the Under Slab Soils Post Slab and Foundation Removal at RVAAP- 39 Load Lines 5, RVAAP- 40 Load Line 7, RVAAP- 41 Load Line 8, and RVAAP- 43 Load Line 10, Jan. 09, 2009
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008
Final Sampling and Analysis Plan and the Site Safety and Health Plan for the Exposed Soil Sampling and Characterization After Slab and Foundation Removals at RVAAP-39 Load Line 5, RVAAP-40 Load Line 7, RVAAP-41 Load Line 8, and RVAAP-43 Load Line 10, Aug. 1, 2007
Final Characterization of 14 AOCs at Ravenna Army Ammunition Plant, March 2007.
Final Sampling and Analysis Plan Addendum for the Characterization of 14 RVAAP AOCs at RVAAP Oct. 2004
Hazardous and Medical Waste Study No. 37-EF-5360-99 Relative Risk Site Evaluation for Newly Added Sites. October 1998
RVAAP-42
Load Line 9 (Back to top)
Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
Draft PBA 2008 Suppliemental Investigation Sampling and Analysis Plan Addendum No. 1, Feb 4, 2009
Final Investigation of the Under Slab Soils Post Slab and Foundation Removal at RVAAP- 39 Load Lines 5, RVAAP- 40 Load Line 7, RVAAP- 41 Load Line 8, and RVAAP- 43 Load Line 10, Jan. 09, 2009
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008
Final Project Completion Report for the Munitions Response for Demolition of Load Lines 5, 7, Building 1039, and Transite Removal at Building T-1604, Volume 1 Main Text and Appendices A-C, Dec 13, 2007
Final Project completion Report for the Munitions Response for Demolition of Load Lines 5, 7, Building 1039, and Transite Removal at Building T-1604, Removal of Remaining Concrete and Miscellaneous Debris at Load Lines 6, 9 and 11. Dec. 13, 2007
Final Report for the Phase I Remedial Investigation at RVAAP-42 Load Line 9, Volume 1-4, Oct 2007
Hazardous and Medical Waste Study No. 37-EF-5360-99 Relative Risk Site Evaluation for Newly Added Sites. October 1998
RVAAP-43
Load Line 10 (Back to top)
Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
Draft PBA 2008 Suppliemental Investigation Sampling and Analysis Plan Addendum No. 1, Feb 4, 2009
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008
Final Sampling and Analysis Plan and the Site Safety and Health Plan for the Exposed Soil Sampling and Characterization After Slab and Foundation Removals at RVAAP-39 Load Line 5, RVAAP-40 Load Line 7, RVAAP-41 Load Line 8, and RVAAP-43 Load Line 10, Aug. 1, 2007
Final Characterization of 14 AOCs at Ravenna Army Ammunition Plant, March 2007.
Final Sampling and Analysis Plan Addendum for the Characterization of 14 RVAAP AOCs at RVAAP Oct. 2004
Hazardous and Medical Waste Study No. 37-EF-5360-99 Relative Risk Site Evaluation for Newly Added Sites. October 1998
RVAAP-44 Load Line 11 (Back to top)
Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
Draft PBA 2008 Suppliemental Investigation Sampling and Analysis Plan Addendum No. 1, Feb 4, 2009
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008
Final Project completion Report for the Munitions Response for Demolition of Load Lines 5, 7, Building 1039, and Transite Removal at Building T-1604, Removal of Remaining Concrete and Miscellaneous Debris at Load Lines 6, 9 and 11. Dec. 13, 2007
Final Project Completion Report for the Munitions Response for Demolition of Load Lines 5, 7, Building 1039, and Transite Removal at Building T-1604, Volume 1 Main Text and Appendices A-C, Dec 13, 2007
Final Remedial Investigation at Load Line 11 (AOC-44) September 2005
Final Report Interim Removal Action at Load Line 11 (AOC-44) March 2004
RVAAP-45
Wet Storage Area (Back to top)
Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
Draft PBA 2008 Suppliemental Investigation Sampling and Analysis Plan Addendum No. 1, Feb 4, 2009
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008
Final Characterization of 14 AOCs at Ravenna Army Ammunition Plant, March 2007.
Final Sampling and Analysis Plan Addendum for the Characterization of 14 RVAAP AOCs at RVAAP Oct. 2004
Hazardous and Medical Waste Study No. 37-EF-5360-99 Relative Risk Site Evaluation for Newly Added Sites. October 1998
RVAAP-46
Building F-15 and F-16 (Back to top)
Draft Sampling and Analysis of Soils Below Floor Slabs at RVAAP- 08 Load Line 1 and Other Building Locations, Mar. 15, 2010
Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
Draft PBA 2008 Suppliemental Investigation Sampling and Analysis Plan Addendum No. 1, Feb 4, 2009
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008
Final Characterization of 14 AOCs at Ravenna Army Ammunition Plant, March 2007.
Final Sampling and Analysis Plan Addendum for the Characterization of 14 RVAAP AOCs at RVAAP Oct. 2004
Hazardous and Medical Waste Study No. 37-EF-5360-99 Relative Risk Site Evaluation for Newly Added Sites. October 1998
RVAAP-47
Building T-5301 (Back to top)
Closure, No Further Action, Statement of Basis for the Final Decision for RVAAP-47 Building T-5301 Interim Removal Action. Dec. 2000
Hazardous and Medical Waste Study No. 37-EF-5360-99 Relative Risk Site Evaluation for Newly Added Sites. October 1998
RVAAP-48
Anchor Test Area (Back to top)
Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
Draft PBA 2008 Suppliemental Investigation Sampling and Analysis Plan Addendum No. 1, Feb 4, 2009
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008
Final Characterization of 14 AOCs at Ravenna Army Ammunition Plant, March 2007.
Final Sampling and Analysis Plan Addendum for the Characterization of 14 RVAAP AOCs at RVAAP Oct. 2004
Hazardous and Medical Waste Study No. 37-EF-5360-99 Relative Risk Site Evaluation for Newly Added Sites. October 1998
RVAAP-49 Central Burn Pits (Back to top)
Final Project Management Plan Performance-Based Acquisition for Six Environmental Areas of Concern, Revision 1, Mar. 1, 2010
Draft Project Management Plan Performance-Based Acquisition for Six Environmental Areas of Concern, Revision 1 at Ravenna Army Ammunition Plant, Nov. 18, 2009
Final Record of Decision for Soil and Dry Sediment at RVAAP- 49 Central Burn Pits at Ravenna Army Ammunition Plant, Apr 21, 2009
Final Removal Action Report for the RVAAP- 49 Central Burn Pits, Dec. 05, 2008
Final Proposed Plan for the Soil and Dry Sediment at the RVAAP-49 Central Burn Pits, Oct. 24, 2008
Final Remedial Investigation Report Addendum No. 1 for the RVAAP- 49 Central Burn Pits at Ravenna Army Ammunition Plant, June 2008
Final Removal Action Work Plan for Central Burn Pits (RVAAP-49), Ravenna Army Ammunition Plant, Ravenna, Ohio. Aug 2007
Final Action Memorandum for Central Burn Pits (RVAAP-49, Ravenna Army Ammunition Plant, Ravenna, Ohio. June 2007
Final Engineering Evaluation/Cost Analysis for Central Burn Pits (RVAAP-49) Ravenna Army Ammunition Plant, Ravenna, Ohio, January 2007
Draft Feasibility Study for Central Burn Pits (RVAAP-49) Ravenna Army Ammunition Plant Ravenna, Ohio March 2006
Final Sampling and Analysis Plan Addendum No. 1 Supplemental Phase II Remedial Investigations RVAAP-04 Open Demolition Area #2, RVAAP-16 Fuze and Booster Quarry Landfill/Ponds and RVAAP-49 Central Burn Pits, Nov 2005
Final Remedial Investigation Report for the Central Burn Pits (Rvaap-49) at the Ravenna Army Ammunition Plant Ravenna, Ohio September 20, 2005
Hazardous and Medical Waste Study No. 37-EF-5360-99 Relative Risk Site Evaluation for Newly Added Sites. October 1998
RVAAP-50 Atlas Scrap Yard (Back to top)
Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
Draft PBA 2008 Suppliemental Investigation Sampling and Analysis Plan Addendum No. 1, Feb 4, 2009
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008
Final Characterization of 14 AOCs at Ravenna Army Ammunition Plant, March 2007.
Final Sampling and Analysis Plan Addendum for the Characterization of 14 RVAAP AOCs at RVAAP Oct. 2004
Hazardous and Medical Waste Study No. 37-EF-5360-99 Relative Risk Site Evaluation for Newly Added Sites. October 1998
RVAAP-51 Dump Along Paris-Windham Road (Back to top)
Draft Site Characterization and Focused Feasibility Study Work Plan for the RVAAP- 51 Dump Along Paris-Windham Road at Ravenna Army Ammunition Plant, Dec. 09, 2009
Final Report for Remedial Design/Removal Action at Paris-Windham Road Dump (AOC-51) at RVAAP March 2004
Hazardous and Medical Waste Study No. 37-EF-5360-99 Relative Risk Site Evaluation for Newly Added Sites. October 1998
Munitions Response Sites (Back to top)
RVAAP-001-R-01 Ramsdell Quarry Landfill MRS
Final Project Management Plan for 14 Military Munitions Response Program Areas of Concern at Ravenna Army Ammunition Plant, Sept 14, 2009
RVAAP-002-R-01 Erie Burning Grounds MRS
Final Project Management Plan for 14 Military Munitions Response Program Areas of Concern at Ravenna Army Ammunition Plant, Sept 14, 2009
RVAAP-004-R-01 Open Demolition Area #2 MRS
Operations and Maintenance Quarterly Effectiveness Evaluation Report #1 for the Sand Creek Barrier, May 2010, May 24, 2010
Final Public Involvement Plan Addendum for the Time Critical Removal Action at the Rocket Ridge Area, May 7, 2010
Final Project Work Plan for the Time Critical Removal Action (TCRA) at the Rocket Ridge Area (RRA) within RVAAP-004-R-01 Open Demolition Area #2 MRS, May 7, 2010
Final Project Management Plan for the Time Critical Removal Action (TCRA) at the Rocket Ridge Area (RRA) within RVAAP-004-R-01 Open Demolition Area #2 MRS, May 7, 2010
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #7, April 2010, April 29, 2010
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #8, May 2010. May 29, 2010
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #6, March, 2010
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #5, February 2010, Feb. 18, 2010
Operations and Maintenance Quarterly Effectiveness Evaluation Report #1 for the Sand Creek Barrier, January 2010, Feb. 1, 2010
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS), Trip Report #4, January 2010
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS), Trip Report #3, December 2009
Final Removal Action Report for the Time Critical Removal Action (TCRA) at the Rocket Ridge Area (RRA) within RVAAP-004-R-01 Open Demolition Area #2 MRS, Dec. 17, 2009
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS), Trip Report #2, Nov. 24, 2009
Draft Removal Action Report for the Time Critical Removal Action (TCRA) at the Rocket Ridge Area (RRA) within RVAAP-004-R-01 Open Demolition Area #2 MRS, Oct. 30, 2009
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS), Trip Report #1, Oct. 29, 2009
Final Construction Completion Report Time Critical Response Action for the Rocket Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Military Munitions Response Program, Sep. 23, 2008
Final Project Management Plan for 14 Military Munitions Response Program Areas of Concern at Ravenna Army Ammunition Plant, Sept 14, 2009
Operations and Maintenance Quarterly Effectiveness Evaluation Reports (#4) and Barrier Repairs Time Critical Response Action for the Rocket Ridge Area of RVAAP-004-R-01 Open Demolition Area #2, Sept. 02, 2009
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) August 2008 – September 2009, Aug. 26, 2008
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) August 2008 – September 2009, Aug. 26, 2008
Final Time Critical Response Action Plan for the Rocket Ridge Area at Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Military Munitions Response Program, Mar. 1, 2008
Final Work Plan for Sand Creek Survey Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Military Munitions Response Program Time Critical Response Action, Oct. 24, 2007
CC-RVAAP-68 Electric Substations (East, West, No. 3)
Draft Project Management Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
Draft Site Safety and Health Plan for the 2010 Phase I Remedial Investigation Service at Compliance Restoration Sites (9 Areas of Concern), Addendum No. 1, July 2, 2010
Final Quality Control Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
CC-RVAAP-69 Building 1048 Fire Station
Draft Project Management Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
Draft Site Safety and Health Plan for the 2010 Phase I Remedial Investigation Service at Compliance Restoration Sites (9 Areas of Concern), Addendum No. 1, July 2, 2010
Final Quality Control Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
CC-RVAAP-70 East Classification Yard
Draft Project Management Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
Draft Site Safety and Health Plan for the 2010 Phase I Remedial Investigation Service at Compliance Restoration Sites (9 Areas of Concern), Addendum No. 1, July 2, 2010
Final Quality Control Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
CC-RVAAP-72 Facility-Wide Underground Storage Tanks
Draft Project Management Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
Draft Site Safety and Health Plan for the 2010 Phase I Remedial Investigation Service at Compliance Restoration Sites (9 Areas of Concern), Addendum No. 1, July 2, 2010
Final Quality Control Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
CC-RVAAP-73 Facility-Wide Coal Storage
Draft Project Management Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
Draft Site Safety and Health Plan for the 2010 Phase I Remedial Investigation Service at Compliance Restoration Sites (9 Areas of Concern), Addendum No. 1, July 2, 2010
Final Quality Control Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
CC-RVAAP-74 Building 1034 Motor Pool Hydraulic Lift
Draft Project Management Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
Draft Site Safety and Health Plan for the 2010 Phase I Remedial Investigation Service at Compliance Restoration Sites (9 Areas of Concern), Addendum No. 1, July 2, 2010
Final Quality Control Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
CC-RVAAP-75 George Road Sewage Treatment Plant
Draft Project Management Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
Draft Site Safety and Health Plan for the 2010 Phase I Remedial Investigation Service at Compliance Restoration Sites (9 Areas of Concern), Addendum No. 1, July 2, 2010
Final Quality Control Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
CC-RVAAP-76 Depot Area
Draft Project Management Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
Draft Site Safety and Health Plan for the 2010 Phase I Remedial Investigation Service at Compliance Restoration Sites (9 Areas of Concern), Addendum No. 1, July 2, 2010
Final Quality Control Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
CC-RVAAP-77 Building 1037 Laundry Waste Water Sum
Draft Project Management Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
Draft Site Safety and Health Plan for the 2010 Phase I Remedial Investigation Service at Compliance Restoration Sites (9 Areas of Concern), Addendum No. 1, July 2, 2010
Final Quality Control Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
CC-RVAAP-78 and CC-RVAAP-80
Draft Project Management Plan for 2010 Phase I Remedial Investigation Services Compliance Restoration Sites CC-RVAAP-78 and CC-RVAAP-80, Aug. 4, 2010
RVAAP-008-R-01 Load Line #1 MRS
Final Project Management Plan for 14 Military Munitions Response Program Areas of Concern at Ravenna Army Ammunition Plant, Sept 14, 2009
RVAAP-012-R-01 Load Line 12 MRS
RVAAP-016-R-01 Fuze and Booster Quarry MRS
Final Project Management Plan for 14 Military Munitions Response Program Areas of Concern at Ravenna Army Ammunition Plant, Sept 14, 2009
RVAAP-019-R-01 Landfill North of Winklepeck MRS
Final Project Management Plan for 14 Military Munitions Response Program Areas of Concern at Ravenna Army Ammunition Plant, Sept 14, 2009
RVAAP-032-R-01 40mm Firing Range MRS
Final Project Management Plan for 14 Military Munitions Response Program Areas of Concern at Ravenna Army Ammunition Plant, Sept 14, 2009
RVAAP-033-R-01 Firestone Test Facility MRS
Final Project Management Plan for 14 Military Munitions Response Program Areas of Concern at Ravenna Army Ammunition Plant, Sept 14, 2009
RVAAP-034-R-01 Sand Creek Dump MRS
Final Project Management Plan for 14 Military Munitions Response Program Areas of Concern at Ravenna Army Ammunition Plant, Sept 14, 2009
RVAAP-046-R-01 Building #F-15 and F-16 MRS
Draft Project Management Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
Draft Site Safety and Health Plan for the 2010 Phase I Remedial Investigation Service at Compliance Restoration Sites (9 Areas of Concern), Addendum No. 1, July 2, 2010
Final Quality Control Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
RVAAP-048-R-01 Anchor Test Area MRS
Draft Project Management Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
Draft Site Safety and Health Plan for the 2010 Phase I Remedial Investigation Service at Compliance Restoration Sites (9 Areas of Concern), Addendum No. 1, July 2, 2010
Final Quality Control Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
RVAAP-050-R-01 Atlas Scrap Yard MRS
Final Project Management Plan for 14 Military Munitions Response Program Areas of Concern at Ravenna Army Ammunition Plant, Sept 14, 2009
RVAAP-060-R-01 Block D Igloo MRS
Final Project Management Plan for 14 Military Munitions Response Program Areas of Concern at Ravenna Army Ammunition Plant, Sept 14, 2009
RVAAP-061-R-01 Block D Igloo-TD MRS
Final Project Management Plan for 14 Military Munitions Response Program Areas of Concern at Ravenna Army Ammunition Plant, Sept 14, 2009
RVAAP-062-R-01 Water Works #4 Dump MRS
Final Project Management Plan for 14 Military Munitions Response Program Areas of Concern at Ravenna Army Ammunition Plant, Sept 14, 2009
RVAAP-063-R-01 Group 8 MRS
Final Project Management Plan for 14 Military Munitions Response Program Areas of Concern at Ravenna Army Ammunition Plant, Sept 14, 2009
|